AVERAGE
QUALITY MATERIALS AND WORKMANSHIP
BASE
SPECIFICATIONS
1)
Roof: |
Gable
or Gambrel, Wood
Shingle or Equivalent |
5)
Floors: |
Concrete
Slab or Equivalent |
2)
Foundation: |
Masonry
Walls or Equivalent |
6)
Plumbing: |
Adequate Number of Outlets Water |
3)
Exterior Walls: |
Concrete
Block, Wood Siding
on Wood Frame or Equivalent |
7)
Lighting: |
Conduit
Wiring with
Minimum Number of
Fixtures |
4)
Interior Finish: |
Stanchion
and Stalls;
Feed Room and
Storage Rooms |
8)
Other Items: |
None |
BASE
COST PER CUBIC FOOT
Without
Loft |
|
10,000 |
15,000
|
20,000 |
30,000 |
50,000
|
75,000 |
100,000 |
150,000 |
$0.70 |
$0.65 |
$0.60 |
$0.60 |
$0.55 |
$0.55 |
$0.50
|
$0.50 |
|
With
Loft |
|
10,000 |
15,000
|
20,000 |
30,000 |
50,000
|
75,000 |
100,000 |
150,000 |
$1.10 |
$1.00 |
$0.95 |
$0.90 |
$0.85 |
$0.80 |
$0.80 |
$0.75 |
For
Low Quality, multiply by .70 |
For High Quality, multiply by 1.40 |
NOTES:
Depreciation: For High Quality - Table D-III, Average Quality - Table D-II,
Low Quality Table D-I
Cost Conversion Factors: See Page II - 153
Adjustments To Base Specifications: None
|