AVERAGE
QUALITY MATERIALS AND WORKMANSHIP
BASE
SPECIFICATIONS
1)
Frame: |
Steel
with Glass Walls and Roof
Not Readily Dismantled |
4)
Floors: |
None |
2) Foundation: |
Concrete/Masonry
or Equivalent |
5) Plumbing: |
Minimum
Number of Water Outlets |
3) Heating: |
See
GH164-02 Series |
6) Lighting:
|
Minimum
Number of Fixtures |
BASE
COST PER S/F
CLASS |
1000
|
1500 |
2000 |
3000 |
4000 |
5000 |
10000 |
GH164-01
(Unheated) |
27.09 |
22.57 |
20.33 |
18.05 |
16.95 |
16.24 |
14.90 |
GH164-02
(Heated) |
35.52 |
27.40 |
24.82 |
22.27 |
20.98 |
20.22 |
18.68 |
For
Low Quality, multiply by .75 |
For
High Quality, multiply by 1.25 |
ADJUSTMENTS
TO BASE PER SQUARE FOOT OF FLOOR AREA
ITEM
|
LOW |
AVERAGE
| HIGH
|
Wood
Flooring |
2.60 |
5.07 |
7.78 |
Concrete
Flooring |
1.53 |
3.07 |
4.60 |
Crushed
Stone
($0.16/SF at 1 inch deep) |
0.16 |
0.16 |
0.16 |
NOTES:
Depreciation: For High Quality - Table D-III, Average Quality - Table
D-II, Low Quality Table D-I
Cost Conversion Factors: See F-2
*P.L. 1993,
c251 includes a provision that readily dismantled greenhouses may be tax
exempt if specific criteria are met.
|