Link to NJ InTouch

link to NJcommuter.com

link to NJDOT home page

e-mail

About the Interchange

Photo Update

Press Releases

 

4&17HEAD.GIF (9209 bytes)

Take a look at what's happening on the construction site.

September 28, 1999

On the left is the new Northeast ramp (from Route 17 Northbound to Route 4 Eastbound) scheduled to be opened to traffic on 10-27-99. In the center is the Southeast flyover (from Route 17 Southbound to Route 4 Eastbound) already in use. To the right is Route 4 Eastbound under construction while maintaining traffic.

 

0063s.jpg (15727 bytes)

September 28, 1999

On the right is the new ramp from Route 4 Westbound to Route 17 Northbound. Only half of the ramp width is currently open to traffic.

0064s.jpg (14507 bytes)


Archived Photos