| September
28, 1999 On the left is the new Northeast ramp
(from Route 17 Northbound to Route 4 Eastbound) scheduled to be opened to traffic on
10-27-99. In the center is the Southeast flyover (from Route 17 Southbound to Route 4
Eastbound) already in use. To the right is Route 4 Eastbound under construction while
maintaining traffic.
|

|