CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES ROUTE U.S.1&9 TRUCK BRIDGE OVER PASSAIC RIVER CONTRACT NO. 001983811 STRUCTURAL, MECHANICAL AND ELECTRICAL REPAIRS CITY OF NEWARK AND KEARNY TOWNSHIP ESSEX AND HUDSON COUNTIES D.P. NO. 01132 BIDS RECEIVED JUNE 14, 2001 CONTRACT AWARD DATE JUNE 26, 2001 BIDDERS TOTAL PRICE BID 1 . IEW CONSTR GP $ 12,027,027.00 PO#8008 TRENTON NJ08650 2 . SCHIAVONE CONSTR CO $ 14,217,840.00 P O BOX 1589 SECAUCUS NJ07096 3 . ANSELMI & DECICCO INC $ 16,026,740.00 1977 SPRINGFIELD AVE MAPLEWOOD NJ07040 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 47,000.00 47,000.00 60,000.00 60,000.00 2 FINAL CLEANUP LS 1 1.00 1.00 20,000.00 20,000.00 3 CONSTRUCTION LAYOUT LS 1 60,000.00 60,000.00 50,000.00 50,000.00 4 FIELD OFFICE TYPE A SET-UP U 1 35,000.00 35,000.00 70,000.00 70,000.00 5 FIELD OFFICE TYPE A MAINTENANCE MO 30 2,000.00 60,000.00 1,500.00 45,000.00 6 TELEPHONE SERVICE LS 1 2,400.00 2,400.00 2,400.00 2,400.00 7 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 10,000.00 10,000.00 40,000.00 40,000.00 LIABILITY INSURANCE 8 POLLUTION LIABILITY INSURANCE LS 1 30,000.00 30,000.00 40,000.00 40,000.00 9 MOBILIZATION LS 1 1,123,000.00 1,123,000.00 1,400,000.00 1,400,000.00 10 CONSTRUCTION SIGNS SM 164 134.00 21,976.00 200.00 32,800.00 11 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 2 6,500.00 13,000.00 30,000.00 60,000.00 CRASH CUSHIONS 12 DRUMS U 35 110.00 3,850.00 100.00 3,500.00 13 TRUCK-MOUNTED ILLUMINATED FLASHING U 2 6,400.00 12,800.00 6,000.00 12,000.00 ARROWS, 1 200 BY 2 400 MM 14 BREAKAWAY BARRICADES U 70 106.00 7,420.00 100.00 7,000.00 15 VARIABLE MESSAGE SIGNS U 2 13,000.00 26,000.00 25,000.00 50,000.00 16 TRAINING REIMBURSEMENT LS 1 45,000.00 45,000.00 45,000.00 45,000.00 17 PROGRESS SCHEDULE LS 1 28,000.00 28,000.00 30,000.00 30,000.00 18 NO ITEM U 0 .00 0.00 .00 0.00 19 NO ITEM U 0 .00 0.00 .00 0.00 20 NO ITEM U 0 .00 0.00 .00 0.00 LIFT BRIDGE OVER PASSAIC RIVER 21 CLEARING SITE, BRIDGE LS 1 98,000.00 98,000.00 70,000.00 70,000.00 22 REINFORCEMENT STEEL IN STRUCTURES KG 200 53.00 10,600.00 5.00 1,000.00 23 EPOXY WATERPROOFING SEAL COAT SM 40 67.00 2,680.00 50.00 2,000.00 24 PRESSURE INJECTION, CONCRETE CRACKS LM 36 460.00 16,560.00 250.00 9,000.00 25 CONCRETE IN SUPERSTRUCTURE, PARAPETS LM 45 890.00 40,050.00 1,000.00 45,000.00 26 STRUCTURAL STEEL LS 1 173,000.00 173,000.00 300,000.00 300,000.00 27 TREATED TIMBER STRUCTURES CM 2 4,100.00 8,200.00 7,500.00 15,000.00 28 TREATED TIMBER STRUCTURES, SHEETING CM 5 4,500.00 22,500.00 10,000.00 50,000.00 29 TREATED TIMBER STRUCTURES, WALES CM 15 5,600.00 84,000.00 11,000.00 165,000.00 30 FURNISHING EQUIPMENT FOR DRIVING PILES LS 1 20,000.00 20,000.00 20,000.00 20,000.00 31 TREATED TIMBER PILES, DRIVEN, 300 MM DIAMETER LM 120 172.00 20,640.00 150.00 18,000.00 32 METAL RAILING (1 RAIL, ALUMINUM) LM 40 475.00 19,000.00 400.00 16,000.00 33 NO ITEM U 0 .00 0.00 .00 0.00 34 CLEANING EXISTING DRAINAGE STRUCTURES U 38 400.00 15,200.00 200.00 7,600.00 35 600 BY 800 MM CONCRETE BARRIER CURB LM 5 1,900.00 9,500.00 1,000.00 5,000.00 36 TEMPORARY JACKING AT PIER LS 1 260,000.00 260,000.00 200,000.00 200,000.00 37 STRUCTURAL STEEL REPAIRS LS 1 46,000.00 46,000.00 7,000.00 7,000.00 38 MULTIROTATIONAL BEARINGS U 8 21,000.00 168,000.00 20,000.00 160,000.00 39 BARRIER GATE PLATFORM LS 1 252,000.00 252,000.00 400,000.00 400,000.00 40 ORNAMENTAL RAILING (TO MATCH EXISTING) LM 46 1,000.00 46,000.00 1,000.00 46,000.00 41 WIRE WRAP LM 270 89.00 24,030.00 60.00 16,200.00 42 CONCRETE, SUBSTRUCTURE REPAIR SM 12 2,900.00 34,800.00 2,000.00 24,000.00 43 HEAT STRAIGHTENING LS 1 14,000.00 14,000.00 5,000.00 5,000.00 44 POST TENSIONING ANCHORAGE REPAIR LS 1 17,000.00 17,000.00 5,000.00 5,000.00 45 FLOORBEAM REPAIR LS 1 16,000.00 16,000.00 10,000.00 10,000.00 46 LIFT SPAN TRUSS REPAIR LS 1 10,000.00 10,000.00 8,000.00 8,000.00 47 SHEAVE JACKING LS 1 112,000.00 112,000.00 600,000.00 600,000.00 48 WINDOWS AND DOORS LS 1 60,000.00 60,000.00 60,000.00 60,000.00 49 FALL ARREST SYSTEM LS 1 37,000.00 37,000.00 50,000.00 50,000.00 50 MASONRY WALLS LS 1 9,000.00 9,000.00 10,000.00 10,000.00 51 LIGHT STANDARD ACCES PLATES U 8 225.00 1,800.00 600.00 4,800.00 52 HAND/POWER TOOL CLEANING SM 47 415.00 19,505.00 1,000.00 47,000.00 53 METAL RAILING LM 21 600.00 12,600.00 500.00 10,500.00 54 SHIMMING OF LIVE LD. BRG. LS 1 200,000.00 200,000.00 120,000.00 120,000.00 55 REPLACEMENT OF COUNTERWEIGHT ROPES LS 1 1,723,000.00 1,723,000.00 850,000.00 850,000.00 56 TRUNNION ASSEMBLIES MODIFICATION LS 1 619,000.00 619,000.00 850,000.00 850,000.00 57 MACHINERY IN GENERAL LS 1 520,000.00 520,000.00 1,250,000.00 1,250,000.00 58 SPAN BALANCING LS 1 59,000.00 59,000.00 150,000.00 150,000.00 59 BALANCING BLOCKS KG 4,690 2.50 11,725.00 6.00 28,140.00 60 SHOT PEENING LS 1 100,000.00 100,000.00 100,000.00 100,000.00 61 ELECTRICAL WORK LS 1 4,054,000.00 4,054,000.00 3,852,000.00 3,852,000.00 62 STANDBY DIESEL ENGINE GENERATOR LS 1 134,000.00 134,000.00 100,000.00 100,000.00 63 AERIAL CABLES LS 1 240,000.00 240,000.00 300,000.00 300,000.00 64 TRAFFIC CONTROL EQUIPMENT LS 1 349,000.00 349,000.00 300,000.00 300,000.00 65 LIGHTNING PROTECTION SYSTEM LS 1 79,000.00 79,000.00 150,000.00 150,000.00 66 CLOSED CIRCUIT TELEVISION LS 1 390,000.00 390,000.00 300,000.00 300,000.00 67 FIRE PROTECTION AND FIRE ALARM SYSTEM LS 1 56,000.00 56,000.00 50,000.00 50,000.00 68 DATA LOGGING LS 1 32,000.00 32,000.00 50,000.00 50,000.00 69 TRAINING LS 1 70,000.00 70,000.00 120,000.00 120,000.00 70 TEMP. BRIDGE OPERATION DURING CONST. LS 1 30,000.00 30,000.00 700,000.00 700,000.00 71 DEMOLITION AND REMOVAL LS 1 107,000.00 107,000.00 400,000.00 400,000.00 72 ASBESTOS REMOVAL LS 1 23,000.00 23,000.00 100,000.00 100,000.00 73 TREAT TIMBER PILES, FURNISHED, 300 MM LM 240 56.00 13,440.00 250.00 60,000.00 DIAMETER 74 NO ITEM U 0 .00 0.00 .00 0.00 75 PAINTING BRIDGES - EXISTING STEEL SM 47 250.00 11,750.00 700.00 32,900.00 76 NO ITEM U 0 .00 0.00 .00 0.00 77 NO ITEM U 0 .00 0.00 .00 0.00 78 NO ITEM U 0 .00 0.00 .00 0.00 79 NO ITEM U 0 .00 0.00 .00 0.00 80 NO ITEM U 0 .00 0.00 .00 0.00 81 NO ITEM U 0 .00 0.00 .00 0.00 82 NO ITEM U 0 .00 0.00 .00 0.00 83 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 1,525,447.00 $ 1,967,700.00 BRIDGE ITEMS $ 10,501,580.00 $ 12,250,140.00 SUB-TOTAL AMOUNTS FOR BRIDGE WORK LIFT BRIDGE OVER PASSAIC RIVER $ 10,501,580.00 $ 12,250,140.00 AGREE AGREE (HEADER) LOW BID =$ 12,027,027.00 (HEADER) 2ND LOW BID =$ 14,217,840.00 COMPUTED LOW BID =$ 12,027,027.00 COMPUTED 2ND LOW BID =$ 14,217,840.00 COMPUTED LOW BID =$ 12,027,027.00 COMPUTED 2ND LOW BID =$ 14,217,840.00