CPSBIDFM-1 DEPARTMENT OF TRANSPORTATION PAGE 1 CONSTRUCTION SERVICES/PROCUREMENT DIVISION TRENTON, NEW JERSEY TABULATION OF BIDS AND UNIT PRICES ROUTE U.S. 9 (1953) SECTION 23E; FROM THE VICINITY OF ROUTE 33 TO SCHIBANOFF LANE; CONTRACT NO. 114960173. GRADING, PAVING & STRUCTURES TOWNSHIP OF FREEHOLD, MONMOUTH COUNTY. FEDERAL PROJECT NO. BHF-0001 (221) D.P. NO. 03127 BIDS RECEIVED MARCH 11, 2004 CONTRACT AWARD DATE APRIL 22, 2004 BIDDERS TOTAL PRICE BID 1 . GEORGE HARMS CONSTR CO INC $ 15,821,321.95 PO#817 FARMINGDALE NJ07727 2 . CARBRO CONSTRUCTORS CORP $ 16,222,542.26 605 OMNI DRIVE HILLSBOROUGH NJ08844 3 . GARDNER M BISHOP INC J/V JOSEPH M SANZARI INC $ 17,451,097.15 399 KNOLLWOOD RD WHITE PLAINS NY10603 4 . IEW CONSTR GP $ 17,961,581.20 PO#8008 TRENTON NJ08650 5 . FERREIRA CONSTRUCTION CO INC $ 18,284,158.75 3121 RT 22 EAST BRANCHBURG NJ08876 6 . UNION PAVING & CONSTR CO INC $ 19,962,415.10 1140 GLOBE AVE MOUNTAINSIDE NJ07092 7 . RAILROAD CONSTR CO INC $ 21,701,808.85 75 GROVE STREET PATERSON NJ07503 8 . INTERCOUNTY PAVING ASSOC LLC REJECTED 859 WILLOW GROVE STREET HACKETTSTOWN NJ07840 ITEM DESCRIPTION UNIT CONTRACT LOW BIDDER 2ND LOW BIDDER NO. QUANTITY UNIT PRICE DOLLAR AMT. UNIT PRICE DOLLAR AMT. 1 PERFORMANCE BOND AND PAYMENT BOND LS 1 85,000.00 85,000.00 140,000.00 140,000.00 2 FINAL CLEANUP LS 1 20,000.00 20,000.00 10,000.00 10,000.00 3 CONSTRUCTION LAYOUT LS 1 484,500.00 484,500.00 200,000.00 200,000.00 4 FIELD OFFICE TYPE E SET-UP U 1 50,000.00 50,000.00 125,000.00 125,000.00 5 FIELD OFFICE TYPE E MAINTENANCE MO 51 3,400.00 173,400.00 100.00 5,100.00 6 TELEPHONE SERVICE LS 1 13,000.00 13,000.00 13,000.00 13,000.00 7 MATERIALS FIELD LABORATORY SET-UP U 1 27,000.00 27,000.00 10,000.00 10,000.00 8 MATERIALS FIELD LABORATORY MAINTENANCE MO 49 1,185.00 58,065.00 50.00 2,450.00 9 CURING AND STORAGE FACILITY SET-UP U 1 17,500.00 17,500.00 2,000.00 2,000.00 10 FUEL PRICE ADJUSTMENT LS 1 25,000.00 25,000.00 25,000.00 25,000.00 11 CURING AND STORAGE FACILITY MAINTENANCE MO 49 405.00 19,845.00 25.00 1,225.00 12 NUCLEAR DENSITY GAUGE U 1 8,100.00 8,100.00 6,000.00 6,000.00 13 TRAINEES HRS 9,000 1.00 9,000.00 1.00 9,000.00 14 OWNER'S AND CONTRACTOR'S PROTECTIVE LS 1 35,000.00 35,000.00 25,000.00 25,000.00 LIABILITY INSURANCE 15 NO ITEM U 0 .00 0.00 .00 0.00 16 NO ITEM U 0 .00 0.00 .00 0.00 17 RAILROAD PROTECTIVE LIABILITY INSURANCE LS 1 75,000.00 75,000.00 5,000.00 5,000.00 18 POLLUTION LIABILITY INSURANCE LS 1 7,500.00 7,500.00 20,000.00 20,000.00 19 PROGRESS SCHEDULE LS 1 15,000.00 15,000.00 50,000.00 50,000.00 20 MOBILIZATION LS 1 1,600,000.00 1,600,000.00 1,600,000.00 1,600,000.00 21 NO ITEM U 0 .00 0.00 .00 0.00 22 NO ITEM U 0 .00 0.00 .00 0.00 23 NO ITEM U 0 .00 0.00 .00 0.00 24 CLEARING SITE LS 1 375,000.00 375,000.00 375,000.00 375,000.00 25 NO ITEM U 0 .00 0.00 .00 0.00 26 NO ITEM U 0 .00 0.00 .00 0.00 27 STRIPPING HA 3 11,500.00 34,500.00 49,333.00 147,999.00 28 ROADWAY EXCAVATION, UNCLASSIFIED CM 28,759 23.20 667,208.80 18.31 526,577.29 29 ROADWAY EXCAVATION, REGULATED WASTE CM 2,312 23.00 53,176.00 23.54 54,424.48 30 NO ITEM U 0 .00 0.00 .00 0.00 31 REMOVAL OF CONCRETE BASE COURSE AND SM 4,831 8.75 42,271.25 19.14 92,465.34 CONCRETE SURFACE COURSES 32 SAWCUTTING LM 5,032 10.50 52,836.00 6.56 33,009.92 33 MILLING, 50 MM AVERAGE DEPTH SM 16,716 3.95 66,028.20 3.59 60,010.44 34 NO ITEM U 0 .00 0.00 .00 0.00 35 OFF-SITE MANAGEMENT OF REGULATED WASTE MGR 222 38.60 8,569.20 83.00 18,426.00 36 SAMPLING AND ANALYSIS FOR DISPOSAL AND/OR U 6 880.00 5,280.00 1,500.00 9,000.00 RECYCLING 37 POROUS FILL CM 1,350 37.65 50,827.50 36.60 49,410.00 38 NO ITEM U 0 .00 0.00 .00 0.00 39 BORROW EXCAVATION, ZONE 3 CM 3,000 15.00 45,000.00 7.85 23,550.00 40 NO ITEM U 0 .00 0.00 .00 0.00 41 DITCH EXCAVATION, UNCLASSIFIED CM 12 75.00 900.00 27.00 324.00 42 EARTH EXCAVATION FOR TEST PITS CM 16 250.00 4,000.00 98.00 1,568.00 43 EARTH EXCAVATION, SUBSURFACE STRUCTURES, CM 132 16.40 2,164.80 26.00 3,432.00 ADDITIONAL DEPTH 44 BROKEN STONE OR WASHED GRAVEL CM 200 70.00 14,000.00 52.00 10,400.00 45 SUBBASE CM 3,207 56.20 180,233.40 36.63 117,472.41 46 UNDERLAYER PREPARATION SM 1,323 6.00 7,938.00 1.20 1,587.60 47 SILT FENCE LM 800 16.00 12,800.00 10.00 8,000.00 48 HEAVY DUTY SILT FENCE LM 60 27.50 1,650.00 16.00 960.00 49 INLET FILTERS U 50 120.00 6,000.00 30.00 1,500.00 50 INLET SEDIMENT TRAPS U 5 160.00 800.00 40.00 200.00 51 ROADWAY EXCAVATION, TEMPORARY EROSION CONTROL CM 175 17.50 3,062.50 16.00 2,800.00 52 CONSTRUCTION DRIVEWAY MGR 518 38.00 19,684.00 33.00 17,094.00 53 GEOTEXTILE SM 834 6.95 5,796.30 1.20 1,000.80 54 HAYBALES U 50 21.50 1,075.00 10.00 500.00 55 FLOATING TURBIDITY BARRIER LM 15 130.00 1,950.00 49.00 735.00 56 NO ITEM U 0 .00 0.00 .00 0.00 57 DENSE GRADED AGGREGATE BASE COURSE, SM 3,918 9.85 38,592.30 7.18 28,131.24 150 MM THICK 58 DENSE GRADED AGGREGATE BASE COURSE, SM 22,086 8.85 195,461.10 10.76 237,645.36 200 MM THICK 59 COARSE AGGREGATE, SIZE NO. 2 CM 2 98.60 197.20 53.00 106.00 60 COARSE AGGREGATE, SIZE NO. 8 CM 8 95.40 763.20 44.00 352.00 61 CONCRETE BASE COURSE, 300 MM THICK SM 1,166 81.25 94,737.50 71.80 83,718.80 62 BITUMINOUS CONCRETE PATCH MGR 50 325.00 16,250.00 138.00 6,900.00 63 RESET BEAM GUIDE RAIL WITH EXISTING POSTS LM 90 26.00 2,340.00 39.00 3,510.00 64 TACK COAT L 12,299 1.25 15,373.75 .53 6,518.47 65 ASPHALT PRICE ADJUSTMENT LS 1 70,000.00 70,000.00 70,000.00 70,000.00 66 CORE SAMPLES, HOT MIX ASPHALT U 40 115.00 4,600.00 120.00 4,800.00 67 TRANSVERSE EXPANSION JOINT, TYPE A LM 72 255.00 18,360.00 328.00 23,616.00 68 SAWCUT GROOVED BRIDGE APPROACH AND SM 1,333 3.65 4,865.45 3.20 4,265.60 TRANSITION SLABS 69 CONCRETE SURFACE COURSE, REINFORCED, 275 MM SM 85 106.00 9,010.00 108.00 9,180.00 THICK 70 BRIDGE APPROACH SLAB, 458 MM THICK SM 531 240.00 127,440.00 191.00 101,421.00 71 BRIDGE APPROACH TRANSITION SLABS, 367 MM SM 802 175.00 140,350.00 143.50 115,087.00 AVERAGE THICKNESS 72 SUPERPAVE HOT MIX ASPHALT 19M64 BASE MGR 18,900 49.50 935,550.00 47.40 895,860.00 COURSE 73 SUPERPAVE HOT MIX ASPHALT 12.5H76 SURFACE MGR 6,850 54.40 372,640.00 56.22 385,107.00 COURSE 74 NO ITEM U 0 .00 0.00 .00 0.00 75 NO ITEM U 0 .00 0.00 .00 0.00 76 SUBBASE OUTLET DRAIN LM 26 120.00 3,120.00 82.00 2,132.00 77 150 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 4 158.00 632.00 130.00 520.00 78 UNDERDRAIN, TYPE F LM 130 84.00 10,920.00 115.00 14,950.00 79 300 MM DUCTILE IRON WATER PIPE, CLASS 52 LM 80 670.00 53,600.00 262.00 20,960.00 80 400 MM DUCTILE IRON WATER PIPE, CLASS 52 LM 955 300.00 286,500.00 328.00 313,240.00 81 NO ITEM U 0 .00 0.00 .00 0.00 82 450 MM CORRUGATED METAL CULVERT PIPE LM 89 164.00 14,596.00 181.00 16,109.00 83 600 MM CORRUGATED METAL CULVERT PIPE LM 38 193.00 7,334.00 197.00 7,486.00 84 750 MM CORRUGATED METAL CULVERT PIPE LM 17 224.00 3,808.00 214.00 3,638.00 85 375 MM REINFORCED CONCRETE CULVERT PIPE LM 314 123.00 38,622.00 164.00 51,496.00 86 450 MM REINFORCED CONCRETE CULVERT PIPE LM 72 194.00 13,968.00 180.00 12,960.00 87 600 MM REINFORCED CONCRETE CULVERT PIPE LM 56 164.00 9,184.00 197.00 11,032.00 88 750 MM REINFORCED CONCRETE CULVERT PIPE LM 27 203.00 5,481.00 214.00 5,778.00 89 750 MM REINFORCED CONCRETE CULVERT PIPE, LM 310 278.00 86,180.00 230.00 71,300.00 CLASS V 90 450 MM CORRUGATED METAL END SECTIONS U 4 550.00 2,200.00 300.00 1,200.00 91 600 MM CORRUGATED METAL END SECTIONS U 2 780.00 1,560.00 400.00 800.00 92 375 MM REINFORCED CONCRETE END SECTIONS U 1 825.00 825.00 600.00 600.00 93 450 MM REINFORCED CONCRETE END SECTIONS U 2 1,072.00 2,144.00 800.00 1,600.00 94 400 MM STEEL CASING PIPE, JACKING METHOD LM 42 1,870.00 78,540.00 2,136.00 89,712.00 95 600 MM STEEL CASING PIPE, JACKING METHOD LM 45 2,000.00 90,000.00 2,631.00 118,395.00 96 375 MM REINFORCED CONCRETE CULVERT PIPE LM 406 213.00 86,478.00 164.00 66,584.00 97 450 MM REINFORCED CONCRETE CULVERT PIPE LM 142 232.00 32,944.00 181.00 25,702.00 98 375 MM REINFORCED CONCRETE END SECTIONS U 3 873.00 2,619.00 500.00 1,500.00 99 450 MM REINFORCED CONCRETE END SECTIONS U 2 1,065.00 2,130.00 800.00 1,600.00 100 NO ITEM U 0 .00 0.00 .00 0.00 101 NO ITEM U 0 .00 0.00 .00 0.00 102 375 MM CORRUGATED METAL CULVERT PIPE LM 0 .00 0.00 0.00 103 450 MM CORRUGATED METAL CULVERT PIPE LM 0 .00 0.00 0.00 104 600 MM CORRUGATED METAL CULVERT PIPE LM 0 .00 0.00 0.00 105 375 MM CORRUGATED METAL END SECTIONS U 0 .00 0.00 0.00 106 450 MM CORRUGATED METAL END SECTIONS U 0 .00 0.00 0.00 107 NO ITEM U 0 .00 0.00 0.00 108 NO ITEM U 0 .00 0.00 0.00 109 INLETS, TYPE B U 45 2,625.00 118,125.00 2,500.00 112,500.00 110 INLETS, TYPE E U 11 3,080.00 33,880.00 2,900.00 31,900.00 111 INLETS, TYPE B-1 U 2 3,830.00 7,660.00 3,500.00 7,000.00 112 INLETS, TYPE D-1 U 3 3,160.00 9,480.00 2,400.00 7,200.00 113 INLETS, TYPE D-2 U 2 4,695.00 9,390.00 4,200.00 8,400.00 114 INLETS, TYPE B MODIFIED U 1 3,090.00 3,090.00 3,200.00 3,200.00 115 INLETS CONVERTED TO MANHOLES U 1 3,090.00 3,090.00 1,500.00 1,500.00 116 MANHOLES U 2 4,800.00 9,600.00 3,000.00 6,000.00 117 MANHOLES, 1.5 M DIAMETER U 1 4,235.00 4,235.00 3,500.00 3,500.00 118 INLET CASTINGS, TYPE B U 2 785.00 1,570.00 500.00 1,000.00 119 INLET CASTINGS, TYPE E U 4 925.00 3,700.00 600.00 2,400.00 120 NEW MANHOLE CASTINGS, SQUARE FRAME, CIRCULAR U 1 1,240.00 1,240.00 700.00 700.00 COVER 121 RESET CASTINGS U 14 480.00 6,720.00 50.00 700.00 122 OUTLET CONTROL STRUCTURE NO. 1 U 1 4,650.00 4,650.00 3,000.00 3,000.00 123 INLETS, TYPE DOUBLE B U 1 4,475.00 4,475.00 4,000.00 4,000.00 124 VERTICAL SAND FILTER U 1 18,635.00 18,635.00 4,000.00 4,000.00 125 NO ITEM U 0 .00 0.00 .00 0.00 126 NO ITEM U 0 .00 0.00 .00 0.00 127 600 MM BY VARIABLE HEIGHT CONCRETE BARRIER LM 510 193.00 98,430.00 213.00 108,630.00 CURB 128 600 BY 1 040 MM CONCRETE BARRIER CURB LM 280 161.00 45,080.00 164.00 45,920.00 129 300 BY 325 MM CONCRETE SLOPING CURB LM 421 41.50 17,471.50 49.00 20,629.00 130 225 BY 400 MM CONCRETE VERTICAL CURB LM 4,566 37.30 170,311.80 45.93 209,716.38 131 150 BY 150 MM TIMBER CURB LM 31 85.60 2,653.60 40.00 1,240.00 132 CONCRETE SIDEWALK, 100 MM THICK SM 194 43.50 8,439.00 43.00 8,342.00 133 HOT MIX ASPHALT DRIVEWAY, 265 MM THICK SM 1,307 30.00 39,210.00 35.50 46,398.50 134 CONCRETE ISLAND, 100 MM THICK SM 532 43.50 23,142.00 54.00 28,728.00 135 CONCRETE HEADWALLS CM 4 1,475.00 5,900.00 375.00 1,500.00 136 MONUMENTS U 27 340.00 9,180.00 350.00 9,450.00 137 BEAM GUIDE RAIL LM 1,284 47.00 60,348.00 46.00 59,064.00 138 BEAM GUIDE RAIL, DUAL-FACED LM 225 70.00 15,750.00 62.00 13,950.00 139 SLOTTED GUIDE RAIL TERMINALS U 3 2,025.00 6,075.00 2,000.00 6,000.00 140 EXTRUDER TERMINALS U 5 3,025.00 15,125.00 3,200.00 16,000.00 141 BEAM GUIDE RAIL ANCHORAGES U 9 825.00 7,425.00 600.00 5,400.00 142 TELESCOPING GUIDE RAIL END TERMINALS U 1 6,150.00 6,150.00 5,200.00 5,200.00 143 RUB RAIL LM 459 25.75 11,819.25 23.00 10,557.00 144 REMOVAL OF GUIDE RAIL LM 1,281 6.20 7,942.20 16.41 21,021.21 145 MISCELLANEOUS CONCRETE CM 9 1,155.00 10,395.00 400.00 3,600.00 146 BEAM GUIDE RAIL ELEMENT LM 151 24.75 3,737.25 36.00 5,436.00 147 SNOW FENCE, PLASTIC LM 22 16.15 355.30 17.00 374.00 148 RIPRAP STONE CHANNEL PROTECTION, 300 MM THICK SM 122 125.00 15,250.00 54.00 6,588.00 (D50=150 MM) 149 EMERGENCY TOWING SERVICE TRP 20 80.00 1,600.00 100.00 2,000.00 150 BREAKAWAY BARRICADES U 20 160.00 3,200.00 95.00 1,900.00 151 PRECAST CONCRETE CURB, CONSTRUCTION BARRIER, LM 2,863 125.00 357,875.00 147.64 422,693.32 TYPE 4 152 DRUMS U 259 100.00 25,900.00 70.00 18,130.00 153 TRAFFIC CONES U 100 46.50 4,650.00 15.00 1,500.00 154 CONSTRUCTION IDENTIFICATION SIGNS, U 2 1,300.00 2,600.00 1,500.00 3,000.00 1 200 BY 2 400 MM 155 VARIABLE MESSAGE SIGNS U 4 7,200.00 28,800.00 3,000.00 12,000.00 156 CONSTRUCTION SIGNS SM 80 300.00 24,000.00 215.00 17,200.00 157 ILLUMINATED FLASHING ARROWS, 600 BY 1 200 MM U 2 2,850.00 5,700.00 2,000.00 4,000.00 158 TRAFFIC CONTROL TRUCKS WITH MOUNTED U 5 13,700.00 68,500.00 3,000.00 15,000.00 CRASH CUSHIONS 159 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 6 6,500.00 39,000.00 4,000.00 24,000.00 SYSTEM, 13 MODULES 160 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 4 11,370.00 45,480.00 4,500.00 18,000.00 SYSTEM, 14 MODULES 161 TEMPORARY CRASH CUSHIONS, QUADGUARD, U 1 16,500.00 16,500.00 24,000.00 24,000.00 6 BAYS, 610 MM WIDE 162 TRAFFIC DIRECTORS, FLAGGERS HRS 4,500 50.00 225,000.00 10.00 45,000.00 163 TRUCK-MOUNTED ILLUMINATED FLASHING U 4 2,850.00 11,400.00 1,000.00 4,000.00 ARROWS, 1 200 BY 2 400 MM 164 REMOVABLE WET WEATHER PAVEMENT MARKING TAPE LM 1,200 6.55 7,860.00 3.30 3,960.00 165 CONTROLLED RELEASE TERMINALS U 1 1,025.00 1,025.00 1,500.00 1,500.00 166 TEMPORARY CRASH CUSHIONS, INERTIAL BARRIER U 2 4,630.00 9,260.00 3,800.00 7,600.00 SYSTEM, 11 MODULES 167 TRAFFIC STRIPES LM 26,280 .52 13,665.60 .82 21,549.60 168 TRAFFIC STRIPES, LONG LIFE, EPOXY RESIN LM 10,010 1.02 10,210.20 1.31 13,113.10 169 TRAFFIC MARKINGS, LINES, LONG LIFE, LM 1,990 1.20 2,388.00 1.97 3,920.30 THERMOPLASTIC 170 TRAFFIC MARKINGS, SYMBOLS, LONG LIFE, SM 36 72.55 2,611.80 54.00 1,944.00 THERMOPLASTIC 171 REMOVAL OF TRAFFIC STRIPES AND MARKINGS LM 11,690 1.15 13,443.50 .98 11,456.20 172 NO ITEM U 0 .00 0.00 .00 0.00 173 NO ITEM U 0 .00 0.00 .00 0.00 174 NO ITEM U 0 .00 0.00 .00 0.00 175 SIGNS SM 51 305.00 15,555.00 312.00 15,912.00 176 GUIDE SIGNS, TYPE GA, STEEL "U" POST SUPPORTS SM 39 325.00 12,675.00 377.00 14,703.00 177 GUIDE SIGN PANELS, TYPE GO SM 41 360.00 14,760.00 377.00 15,457.00 178 FLEXIBLE DELINEATORS, GROUND MOUNTED U 25 20.75 518.75 30.00 750.00 179 FLEXIBLE DELINEATORS, GUIDE RAIL MOUNTED U 50 20.75 1,037.50 7.00 350.00 180 FLEXIBLE DELINEATORS, BARRIER CURB MOUNTED U 38 20.75 788.50 7.00 266.00 181 NO ITEM U 0 .00 0.00 .00 0.00 182 FIRE HYDRANT ASSEMBLIES U 6 4,420.00 26,520.00 3,000.00 18,000.00 183 WATER SERVICE CONNECTIONS U 2 1,440.00 2,880.00 1,000.00 2,000.00 184 300 MM GATE VALVES AND BOXES U 2 2,085.00 4,170.00 1,500.00 3,000.00 185 400 BY 400 TAPPING SLEEVES AND VALVES U 2 20,650.00 41,300.00 10,000.00 20,000.00 186 NO ITEM U 0 .00 0.00 .00 0.00 187 THREE 100 MM POLYVINYL CHLORIDE CONDUIT LM 222 101.00 22,422.00 85.00 18,870.00 188 1.8 M BY 3.6 M VERIZON CHAMBERS U 6 6,590.00 39,540.00 6,000.00 36,000.00 189 1.8 M BY 3.6 M JCPL CHAMBERS U 2 6,215.00 12,430.00 6,000.00 12,000.00 190 1.2 BY 1.2 M CABLEVISION MANHOLES U 4 3,350.00 13,400.00 3,500.00 14,000.00 191 NO ITEM U 0 .00 0.00 .00 0.00 192 400 MM BUTTERFLY VALVES AND BOXES U 2 3,100.00 6,200.00 3,000.00 6,000.00 193 NO ITEM U 0 .00 0.00 .00 0.00 194 TWO 150 MM STEEL CONDUIT LM 90 280.00 25,200.00 279.00 25,110.00 195 FOUR 100 MM POLYVINYL CHLORIDE CONDUIT LM 254 132.00 33,528.00 105.00 26,670.00 196 BLOWOFF ASSEMBLY U 2 2,250.00 4,500.00 6,500.00 13,000.00 197 SIX 100 MM POLYVINYL CHLORIDE CONDUIT LM 866 162.00 140,292.00 131.00 113,446.00 198 53 MM RIGID METALLIC CONDUIT, TYPE CUG LM 19 78.00 1,482.00 56.00 1,064.00 199 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 52 95.50 4,966.00 69.00 3,588.00 200 78 MM RIGID METALLIC CONDUIT, TYPE CUR LM 95 189.00 17,955.00 151.00 14,345.00 201 78 MM RIGID NONMETALLIC CONDUIT LM 922 52.75 48,635.50 33.00 30,426.00 202 GROUND WIRE, NO. 8 AWG LM 1,485 3.90 5,791.50 4.10 6,088.50 203 MULTIPLE LIGHTING WIRE, NO. 2 AWG LM 5,295 7.80 41,301.00 8.20 43,419.00 204 MULTIPLE LIGHTING WIRE, NO. 10 AWG LM 592 3.75 2,220.00 4.10 2,427.20 205 SERVICE WIRE, NO. 6 AWG LM 48 6.65 319.20 7.00 336.00 206 FOUNDATIONS, TYPE 2M-MC U 1 2,090.00 2,090.00 2,800.00 2,800.00 207 JUNCTION BOX FOUNDATIONS U 22 1,720.00 37,840.00 1,500.00 33,000.00 208 965 MM JUNCTION BOXES U 4 2,565.00 10,260.00 2,300.00 9,200.00 209 450 BY 900 MM JUNCTION BOXES U 14 1,500.00 21,000.00 1,400.00 19,600.00 210 NO ITEM U 0 .00 0.00 .00 0.00 211 NO ITEM U 0 .00 0.00 .00 0.00 212 NO ITEM U 0 .00 0.00 .00 0.00 213 TWO 53 MM RIGID NON-METALLIC CONDUIT, LM 17 85.50 1,453.50 73.00 1,241.00 TYPE BS 214 TWO 53 MM RIGID NON-METALLIC CONDUIT, LM 633 82.00 51,906.00 63.00 39,879.00 TYPE BC 215 TWO 53 MM RIGID NON-METALLIC CONDUIT, LM 602 106.00 63,812.00 75.50 45,451.00 TYPE CB 216 NO ITEM U 0 .00 0.00 .00 0.00 217 LIGHTING STANDARD ASSEMBLIES, TYPE L-2.4-V-X U 4 2,725.00 10,900.00 2,700.00 10,800.00 218 LIGHTING STANDARD ASSEMBLIES, TYPE L-2.4-CF-X U 8 2,300.00 18,400.00 2,300.00 18,400.00 219 LIGHTING STANDARD ASSEMBLIES, U 8 3,100.00 24,800.00 3,000.00 24,000.00 TYPE L-2.4-12.2-CF-Y 220 LIGHTING STANDARD ASSEMBLIES, U 2 2,950.00 5,900.00 2,900.00 5,800.00 TYPE L-2.4-12.2-SB-CF-Y 221 LIGHTING STANDARD ASSEMBLIES, U 1 3,190.00 3,190.00 3,200.00 3,200.00 TYPE L-4.6-12.2-CF-Y 222 METER CABINETS, TYPE 2M-MC U 1 695.00 695.00 750.00 750.00 223 SIGN LIGHTING ASSEMBLY, STRUCTURE NO. 2 LS 1 29,000.00 29,000.00 35,000.00 35,000.00 224 SIGN LIGHTING ASSEMBLY, STRUCTURE NO. 3 LS 1 19,700.00 19,700.00 25,000.00 25,000.00 225 UNDERDECK LIGHTING ASSEMBLIES, TYPE L-P-Q U 8 2,520.00 20,160.00 3,000.00 24,000.00 226 18 FIBER OPTIC CABLE LM 1,605 17.00 27,285.00 14.75 23,673.75 227 8 FIBER CABLE LM 278 10.20 2,835.60 10.00 2,780.00 228 NO ITEM U 0 .00 0.00 .00 0.00 229 TOPSOILING, 100 MM THICK SM 24,500 1.95 47,775.00 2.40 58,800.00 230 FERTILIZING AND SEEDING, TYPE F SM 2,450 .40 980.00 .60 1,470.00 231 WILDFLOWER SEEDING SM 520 3.10 1,612.00 4.00 2,080.00 232 FERTILIZING AND SEEDING, TYPE P SM 24,500 .40 9,800.00 .60 14,700.00 233 TOPSOIL STABILIZATION MATTING SM 473 3.40 1,608.20 5.00 2,365.00 234 STRAW MULCHING SM 26,950 .40 10,780.00 .60 16,170.00 235 WOOD MULCHING SM 3,100 3.40 10,540.00 3.50 10,850.00 236 NO ITEM U 0 .00 0.00 .00 0.00 237 ACER RUBRUM, B&B, 50 TO 60 MM CALIPER, U 13 210.00 2,730.00 210.00 2,730.00 3.6 TO 4.2 M HIGH 238 CORNUS FLORIDA, B&B, 1.8 TO 2.5 M HIGH U 35 93.00 3,255.00 100.00 3,500.00 239 CORNUS KOUSA, B&B, HEAVY, 2.5 TO 3.0 M HIGH U 28 210.00 5,880.00 210.00 5,880.00 240 EUONYMUS ALATA "COMPACTA", B&B, U 371 26.00 9,646.00 30.00 11,130.00 0.6 TO 0.9 M HIGH 241 ILEX OPACA FEMALE, B&B, 1.5 TO 1.8 M HIGH U 15 155.00 2,325.00 160.00 2,400.00 242 JUNIPERUS CHINENSIS SARGENTII, CANS, U 53 18.65 988.45 20.00 1,060.00 0.4 TO 0.5 M SPREAD 243 LIQUIDAMBAR STYRACIFLUA, B&B, 50 TO 60 MM U 17 207.00 3,519.00 215.00 3,655.00 CALIPER, 3.0 TO 3.6 M HIGH 244 MALUS 'SNOWDRIFT', B&B, 40 TO 45 MM U 8 135.00 1,080.00 140.00 1,120.00 CALIPER, 1.8 TO 2.0 M HIGH 245 MALUS SARGENTII, B&B, 30 TO 40 MM CALIPER, U 7 115.00 805.00 120.00 840.00 1.5 TO 1.8 M HIGH 246 PINUS STROBUS, B&B, 2.0 TO 2.5 M HIGH U 104 125.00 13,000.00 130.00 13,520.00 247 PINUS STROBUS, B&B, 2.7 TO 3.0 M HIGH U 54 207.00 11,178.00 210.00 11,340.00 248 PYRUS CALLERYANA "REDSPIRE", B&B, 80 TO 90 MM U 31 260.00 8,060.00 270.00 8,370.00 CALIPER, 3.6 TO 4.2 M HIGH 249 QUERCUS COCCINEA, B&B, 50 TO 60 MM CALIPER, U 55 217.00 11,935.00 220.00 12,100.00 3.6 TO 4.2 M HIGH 250 TILIA CORDATA "GREENSPIRE", B&B, 80 TO 90 MM U 20 388.00 7,760.00 400.00 8,000.00 CALIPER, 3.6 TO 4.2 M HIGH 251 VACCINIUM CORYMBOSUM, B&B, 0.5 TO 0.6 M HIGH U 439 21.00 9,219.00 22.00 9,658.00 252 VIBURNUM DENTATUM, BR, 0.6 TO 0.9 M HIGH U 439 13.00 5,707.00 14.00 6,146.00 253 WATERING CM 303 21.00 6,363.00 26.00 7,878.00 254 CERCIS CANADENSIS, B&B, 1.8-2.5 M HIGH U 21 83.00 1,743.00 90.00 1,890.00 255 CLETHRA ALNIFOLIA, #3 CAN, 0.5-0.6 M HIGH U 445 20.75 9,233.75 22.00 9,790.00 256 ILEX OPACA MALE, B&B, 1.5-1.8 M HIGH U 3 187.00 561.00 190.00 570.00 257 MALUS 'WHITE CASCADE', B&B, 40-45 MM CALIPER, U 7 155.00 1,085.00 160.00 1,120.00 1.8-2.0 M HIGH 258 PRUNUS 'OKAME', B&B, 50-60 MM CALIPER U 19 207.00 3,933.00 210.00 3,990.00 259 LIRIODENDRON TULIPIFERA, BR, S2T1, 0.5-0.6 M U 662 10.40 6,884.80 12.00 7,944.00 HIGH 260 LIQUIDAMBAR STYRACIFLUA, BR, S2T1, 0.5-0.6 M U 661 10.40 6,874.40 12.00 7,932.00 HIGH 261 EXTENDED PLANT ESTABLISHMENT LS 1 8,900.00 8,900.00 9,000.00 9,000.00 262 NONVEGETATIVE SURFACE, HOT MIX ASPHALT SM 3,000 25.00 75,000.00 21.50 64,500.00 263 NO ITEM U 0 .00 0.00 .00 0.00 264 NO ITEM U 0 .00 0.00 .00 0.00 265 NO ITEM U 0 .00 0.00 .00 0.00 266 NO ITEM U 0 .00 0.00 .00 0.00 267 NO ITEM U 0 .00 0.00 .00 0.00 268 NO ITEM U 0 .00 0.00 .00 0.00 269 NO ITEM U 0 .00 0.00 .00 0.00 270 NO ITEM U 0 .00 0.00 .00 0.00 271 NO ITEM U 0 .00 0.00 .00 0.00 272 NO ITEM U 0 .00 0.00 .00 0.00 273 NO ITEM U 0 .00 0.00 .00 0.00 274 NO ITEM U 0 .00 0.00 .00 0.00 ROUTE U.S. 9 OVER COUNTY ROUTE 522 & CONRAIL 275 TEMPORARY SHIELDING LS 1 25,000.00 25,000.00 200,000.00 200,000.00 276 CLEARING SITE, BRIDGE LS 1 360,000.00 360,000.00 360,000.00 360,000.00 277 FOUNDATION EXCAVATION CM 4,360 21.60 94,176.00 58.85 256,586.00 278 CONCRETE IN STRUCTURES, FOOTINGS CM 1,205 340.00 409,700.00 588.00 708,540.00 279 CONCRETE IN STRUCTURES, RETAINING WALLS CM 225 780.00 175,500.00 1,241.00 279,225.00 280 CONCRETE IN SUBSTRUCTURES, ABUTMENT WALLS CM 680 660.00 448,800.00 981.00 667,080.00 281 CONCRETE IN SUBSTRUCTURES, PIER SHAFTS CM 210 1,170.00 245,700.00 982.00 206,220.00 282 CONCRETE IN SUPERSTRUCTURE, DECK SLABS - HPC CM 650 995.00 646,750.00 1,177.00 765,050.00 283 CONCRETE IN SUPERSTRUCTURE, SIDEWALKS CM 45 980.00 44,100.00 852.00 38,340.00 284 CONCRETE IN SUPERSTRUCTURE, PARAPETS LM 180 840.00 151,200.00 427.00 76,860.00 285 REINFORCEMENT STEEL IN STRUCTURES KG 130,600 2.70 352,620.00 2.76 360,456.00 286 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 139,900 2.85 398,715.00 3.31 463,069.00 COATED 287 EPOXY WATERPROOFING SEAL COAT SM 110 51.00 5,610.00 6.00 660.00 288 100 BY 100 MM PREFORMED ELASTOMERIC LM 90 290.00 26,100.00 98.00 8,820.00 JOINT SEALER 289 SAWCUT GROOVED DECK SURFACE SM 2,300 3.65 8,395.00 2.70 6,210.00 290 STRUCTURAL STEEL LS 1 1,551,000.00 1,551,000.00 1,705,000.00 1,705,000.00 291 STRUCTURAL STEEL DECK JOINTS LS 1 91,000.00 91,000.00 80,000.00 80,000.00 292 SHEAR CONNECTORS U 14,364 2.30 33,037.20 2.50 35,910.00 293 STRUCTURAL BEARING ASSEMBLY U 63 1,890.00 119,070.00 2,000.00 126,000.00 294 CHAIN-LINK FENCE, PVC-COATED STEEL, BRIDGE, LM 180 245.00 44,100.00 321.00 57,780.00 1.9 M HIGH, CURVED TOP 295 ELECTRIC CONDUITS LM 140 97.50 13,650.00 118.00 16,520.00 296 TELEPHONE CONDUITS LM 420 54.25 22,785.00 118.00 49,560.00 297 CABLE TELEVISION CONDUITS LM 280 62.00 17,360.00 118.00 33,040.00 298 ITS CONDUITS LM 140 92.00 12,880.00 131.00 18,340.00 299 TEMPORARY SHEETING SM 2,940 .01 29.40 53.80 158,172.00 300 200 MM CORRUGATED STEEL UNDERDRAIN PIPE LM 75 161.00 12,075.00 115.00 8,625.00 301 375 BY 810 MM CONCRETE BARRIER CURB, BRIDGE LM 69 342.00 23,598.00 327.00 22,563.00 302 375 MM BY VARIABLE HEIGHT CONCRETE BARRIER LM 67 440.00 29,480.00 394.00 26,398.00 CURB, BRIDGE 303 CONCRETE SLOPE PROTECTION, REINFORCED, SM 555 140.00 77,700.00 64.50 35,797.50 100 MM THICK 304 41 MM FLEXIBLE METAL CONDUIT LM 16 47.50 760.00 49.00 784.00 305 53 MM FLEXIBLE METAL CONDUIT LM 2 61.00 122.00 70.00 140.00 306 41 MM RIGID METALLIC CONDUIT, TYPE CUG LM 100 54.00 5,400.00 56.00 5,600.00 307 53 MM RIGID METALLIC CONDUIT, TYPE CUG LM 7 95.00 665.00 56.00 392.00 308 78 MM RIGID METALLIC CONDUIT, TYPE CUG LM 145 56.00 8,120.00 151.00 21,895.00 309 JUNCTION BOX FRAMES AND COVERS U 2 1,075.00 2,150.00 900.00 1,800.00 310 200 BY 200 BY 150 MM JUNCTION BOX U 3 310.00 930.00 400.00 1,200.00 311 FOUNDATION EXCAVATION, REGULATED WASTE CM 1,040 25.00 26,000.00 26.00 27,040.00 312 NO ITEM U 0 .00 0.00 .00 0.00 313 NO ITEM U 0 .00 0.00 .00 0.00 314 NO ITEM U 0 .00 0.00 .00 0.00 OVERHEAD SIGN SUPPORT STRUCTURE NO. 2 315 FOUNDATION EXCAVATION CM 57 53.50 3,049.50 33.00 1,881.00 316 CONCRETE IN STRUCTURES, FOOTINGS CM 38 595.00 22,610.00 789.00 29,982.00 317 REINFORCEMENT STEEL IN STRUCTURES KG 650 2.70 1,755.00 2.20 1,430.00 318 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 480 2.85 1,368.00 3.31 1,588.80 COATED 319 OVERHEAD SIGN SUPPORT, STRUCTURE NO. 2 U 1 64,000.00 64,000.00 65,000.00 65,000.00 320 TEMPORARY SHEETING SM 31 50.50 1,565.50 54.00 1,674.00 321 NO ITEM U 0 .00 0.00 .00 0.00 322 NO ITEM U 0 .00 0.00 .00 0.00 323 NO ITEM U 0 .00 0.00 .00 0.00 324 NO ITEM U 0 .00 0.00 .00 0.00 CANTILEVER SIGN SUPPORT, STRUCTURE NO. 3 325 FOUNDATION EXCAVATION CM 35 50.00 1,750.00 33.00 1,155.00 326 CONCRETE IN STRUCTURES, FOOTINGS CM 9 1,075.00 9,675.00 800.00 7,200.00 327 REINFORCEMENT STEEL IN STRUCTURES KG 280 2.70 756.00 2.20 616.00 328 REINFORCEMENT STEEL IN STRUCTURES, EPOXY KG 365 2.85 1,040.25 3.31 1,208.15 COATED 329 CANTILEVER SIGN SUPPORT, STRUCTURE NO. 3 U 1 30,250.00 30,250.00 45,000.00 45,000.00 330 TEMPORARY SHEETING SM 35 25.00 875.00 54.00 1,890.00 331 NO ITEM U 0 .00 0.00 .00 0.00 332 NO ITEM U 0 .00 0.00 .00 0.00 333 NO ITEM U 0 .00 0.00 .00 0.00 334 NO ITEM U 0 .00 0.00 .00 0.00 SUMMARY OF AMOUNTS ROAD ITEMS $ 10,198,350.10 $ 9,234,244.81 BRIDGE ITEMS $ 5,622,971.85 $ 6,988,297.45 SUB-TOTAL AMOUNTS FOR BRIDGE WORK ROUTE U.S. 9 OVER COUNTY ROUTE 522 & CONRAIL $ 5,484,277.60 $ 6,829,672.50 OVERHEAD SIGN SUPPORT STRUCTURE NO. 2 $ 94,348.00 $ 101,555.80 CANTILEVER SIGN SUPPORT, STRUCTURE NO. 3 $ 44,346.25 $ 57,069.15 AGREE AGREE (HEADER) LOW BID =$ 15,821,321.95 (HEADER) 2ND LOW BID =$ 16,222,542.26 COMPUTED LOW BID =$ 15,821,321.95 COMPUTED 2ND LOW BID =$ 16,222,542.26 COMPUTED LOW BID =$ 15,821,321.95 COMPUTED 2ND LOW BID =$ 16,222,542.26