route 52 causeway bridge replacement graphic

Archived Photos

(click on thumbnail photos to enlarge in bottom window)

April 23, 2008

Crews are placing bituminous pavement on the temporary ramp.
Piles for the southbound bridge are being installed inside a cofferdam.
Crews are pouring the footing of a southbound pier from the bridge deck to of the northbound bridge.
 

Crews are driving sheet piles for the west bulkhead adjacent to the recently constructed piers for the southbound bridge.

The prestressed concrete girder is being lifted into place on the southbound bridge adjacent to the west bulkhead (on left).

The columns for a southbound pier is being formed and poured. To the left, precast concrete girders are being delivered. To the right, sheet piles are being driven in preparation for the next footing pour.
.
 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2020
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  July 8, 2008