NJ Home   Services A to Z   Departments/Agencies FAQs
Great Seal of the State of New Jersey
NJDOT Site Index  |  Search: NJ Home   NJDOT
Disclaimer  
Great Seal of the State of New Jersey

route 52 causeway bridge replacement graphic

Archived Photos

(click on thumbnail photos to enlarge in bottom window)

June 30, 2008


Southbound bridge deck construction showing installation of a modular joint. Shown on the right is the northbound bridge deck already in service and open to vehicular traffic.

Prestressed concrete girder placement on the southbound bridge.

A crew is preparing the bridge seat of the southbound bridge abutment for the subsequent installation of the bearings.

Contractors installing intermediate diaphragm steel between the prestressed concrete girders on the southbound bridge.

Contractor installing precast deck panels on the southbound bridge deck. Steel angles embedded into the top flanges of the girders are being used to support the precast deck panels.

.
 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2020
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  October 16, 2008