Design Document Change Announcements


Overview


The New Jersey Department of Transportation (NJDOT) issues these Design Document Change Announcements:

Baseline Document Change (BDC)

Announcements are notices that a Baseline Document has been modified in part or in whole. A Baseline document is defined as any official document that has gone through an initial approval process and was approved for use as intended. A BDC is an alteration to or rewriting of any officially approved document. New documents are also announced with a BDC.

Corrective Action Notices (CAN)

Notices that identify and address problems that may lead to additional costs, impact project schedules, or may be systemic in nature. They include a corrective action plan designed to eliminate the possibility of a recurrence. When these changes alter any Baseline Document, a Baseline Document Change (BDC) Announcement follows.

Quality Improvement Advisories (QIA)

Advisories that notify of problems that have occurred. They include possible solutions and lessons learned. Other uses include notification of efforts to minimize impacts to the project delivery schedule as well as avoiding unanticipated costs associated with project changes.

Document Codes:

D   - Construction Detail PR - Procedure
MB - Design Manual, Bridge S   - Specification
MR - Design Manual, Roadway T   - Other

Implementation Codes are available in BDC03T-06, and the Standard Distribution procedure is available in BDC03T-04.

 BDC/CAN/QIA Number and Description

2012
12/17/2012

BDC12S-08 - Chain-link Fence - Revision to Subsection 509.04 of the 2007 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.

11/21/2012

BDC12S-14 - Shear Connectors - Revision to Subparts/Subsection 506.03.03, 506.04 and 507.03.06 of the 2007 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.


10/17/2012
BDC12T-03 - Right of Way Design Guidelines, 2012 released. See the print version in Right of Way Design Guidelines (pdf 319k).
10/12/2012

BDC12S-12 - Disposal of Unclassified Excavation - Revision to Subparts 201.03.01 and 202.03.03 of the 2007 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.

09/28/2012

BDC12S-11 - Trenches Restoration - Revision to Section 601 (Pipe), Subsection 601.04 of the 2007 Standard Specifications for Road and Bridge Construction. See the updated Standard Inputs.

09/21/2012

BDC12S-13 - Lump Sum Items - Subsections 151.04, 152.04, 157.04 and 160.04 of the 2007 Standard Specifications have been revised to change some pay units from “LUMP SUM” to “DOLLAR”. See the updated Standard Inputs.

07/20/2012

BDC12S-09 - Revision to the Federal Attachment No.1 “Required Contract Provisions Federal Aid Construction Contracts” (Form FHWA-1273). See the updated Standard Inputs.

06/27/2012

BDC12S-05 - Training Reimbursement - The Minority/ Female Outreach and Training Program Attachment for Wholly State Funded Projects and the Item "Training Reimbursement" (Item No. 153013P) have been eliminated.


06/18/2012
BDC12T-04 - Tidelands Application Guidelines, 2012 released. See the print version in Tidelands Application Guidelines (pdf 1.1m).

06/11/2012
BDC12T-07 - Working Drawings Manual, 2012 released. See the print version in Working Drawings Manual (pdf 239k).
05/29/2012

BDC12S-07 - American Recovery and Reinvestment Act, Revision to the 2007 Standard Specifications, Subsections 101.01, 101.03, 104.03 and 109.05 to delete American Recovery and Reinvestment Act requirements, deleted the term "Completion", and simplify cost of change threshold to $7,500. See the updated Standard Inputs.


05/24/2012
BDC12T-02 - Right of Way Engineering Manual, 2012, released. See the BDC announcement for the 12 major changes. See the print version in ROWEManual (pdf 1.3m) or see the on-line version in the Right of Way Engineering Manual.
05/02/2012

BDC12S-03 - Ride Quality - Revision to the 2007 Standard Specifications, subpart 401.03.03 to provide a new method of developing Pay Equations and to include provisions for excluding all potential impediments in achieving a smooth ride quality of the final riding surface. See the updated Standard Inputs.

04/20/2012

BDC12S-02 - FHWA and State Funded Project Attachments - Revised Attachments to the Special Provisions for the FHWA & Wholly State Funded Projects have been updated. Web site information regarding Davis-Bacon and related act has been revised. Email contact / correspondence information has been revised at several locations. See the updated Standard Inputs.

03/30/2012

BDC12S-06 - Audits, Field Office & Materials Field Laboratory - Revision to the 2007 Standard Specifications, Subsection 109.09, Subparts 155.03.01 and 156.03.01 have been revised to remove proprietary names and add document retention requirements. See the Updated Standard Inputs.


03/15/2012
BDC12T-05 - Supplemental Guide Signing Manual, 2012 released to provide the standards, criteria, and limitations for the installation of supplemental guide signing for traffic generators and motorist attractions along the highway system. See the print version in SGSM (pdf 188k) or see the on-line version in the Supplemental Guide Signing Manual.

03/06/2012
BDC12T-01 - Access Design Guidelines, 2012 released. Major changes include Temporary Site Mitigation Work and Temporary Site Mitigation Work (Access), and sending both Lot Owner Access Concurrence and Lot Owner Lease Agreement to property owners with proposed access alterations. Use a printer that includes 11x17 paper to print the Access Design Guidelines (pdf 965k). Also, see the online version of the Access Design Guidelines.
02/17/2012 BDC11D-06 - Cantilever Sign Support 26" OD post availability - Revisions to the Standard Drawings for Overhead and Cantilever Sign Support Structures, 2007, to sign Structure DRG sheets CA-G3, CA-G4 and CA-D6. Download the print version in this ZIP File (168k). See the CADD Support page for the CADD files.
02/14/2012

BDC11S-13 - Bond Liability Insurance and Telephone Service - Revision to the 2007 Standard Specifications, Subparts/Subsections 151.03.01, 152.03.01, 155.03.03 and 155.04 have been revised to add a requirement of receiving paid invoice to ensure accuracy of payment, revised the subpart to match the new DC-175 Form, and removed the telephone services as an Item. See the Updated Standard Inputs.

01/12/2012

BDC12S-01 - Inquiries Before Award of Contract - Revision to the 2007 Standard Specifications, Subsection 101.04 has been revised to increase the number of days available to the NJDOT between
submitting inquiries and the opening of bids. See the Updated Standard Inputs.

01/03/2012

BDC11T-01 - Release of the Design Exception Manual, 2012. Major changes include a flowchart, FHWA review for interstates, Department of Defense coordination for Interstate vertical clearance, prior approval for any construction changes that affect approved design exceptions or that create the need for new ones, Crash Analysis data, preventive maintenance clarification, impacts of multiple CSDEs, and graphically check vertical curves for stopping sight distance. See the Design Exception Manual.

 
Go to NJDOT home page Contact Us | Privacy Notice | Legal Statement | Accessibility Statement  Go to State of New Jersey home page
  department: home | about | NJ commuter | in the works | business | engineering | freight, air & water | capital | community | data | links | index
  statewide: NJ Home | about NJ | business | government | state services A to Z | departments

  Copyright © State of New Jersey, 2002-2017
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600
OPRA - open public records act

  Last Updated:  October 11, 2016