Section 8

DELIVERY AND PAYMENT


 

 

 

8-01     MATERIALS TO BE DELIVERED

8-02     PERFORMANCE SCHEDULE

Using whatever guidelines are provided elsewhere within these Specification, the NJDOT and the Contractor shall develop a mutually agreed-upon schedule for the satisfactory completion and delivery of all work, products and services ordered by the NJDOT.  This schedule shall be consistent with sound photogrammetric production concepts and procedures and with the NJDOT’s need for the mapping.

8-03     BASIS FOR PAYMENT