Short-term Priority Improvements
The New Jersey Department of
Transportation developed a
prioritized list of specific
high priority improvements
that were essential to preserve
the structural integrity of
the bridge while a long-term
solution (replacement or rehabilitation)
was decided upon.
The high priority improvements identified include:
|
- repairing the deteriorated concrete railings at the east end of the structure;
- performing deck repairs to the most deteriorated spans;
- repairs to structural steel and concrete supports; and
- installing a drainage system along
the full length of the
bridge.
|

The roadway deck is cracked
and deteriorated.
|

On the improved deck, the left lane has the
deck overlay and the right lane does not.
|

Both lanes completed with deck overlay.
|
|