CONTRACT ITEMS/SERVICES BY VENDOR
|
| Vendor:
ALL CLEAN BUILDING SERVICES
|
Contract Number:
63552
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00001
|
COMM CODE:
910-39-055118
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR ONE (1)
TECHNOLOGY COMPLEX
|
1.000
|
HOUR
|
N/A
|
$9.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00002
|
COMM CODE:
910-39-055119
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR TWO (2)
TECHNOLOGY COMPLEX
|
1.000
|
HOUR
|
N/A
|
$9.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00003
|
COMM CODE:
910-39-055120
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR THREE (3)
TECHNOLOGY COMPLEX
|
1.000
|
HOUR
|
N/A
|
$12.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00004
|
COMM CODE:
910-39-055121
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR ONE (1)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
HOUR
|
N/A
|
$12.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00005
|
COMM CODE:
910-39-055122
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR TWO (2)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
HOUR
|
N/A
|
$9.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00006
|
COMM CODE:
910-39-055123
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR THREE (3)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
HOUR
|
N/A
|
$9.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00007
|
COMM CODE:
910-39-055124
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR ONE (1)
FIRING RANGE
|
1.000
|
HOUR
|
N/A
|
$9.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00008
|
COMM CODE:
910-39-055125
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR TWO (2)
FIRING RANGE
|
1.000
|
HOUR
|
N/A
|
$9.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00009
|
COMM CODE:
910-39-055126
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARY SCHEDULED DAILY TASKS
PRICE PER MANDATORY DAILY HOUR
AS PER SPECIFICATIONS.
YEAR THREE (3)
FIRING RANGE
|
1.000
|
HOUR
|
N/A
|
$9.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00010
|
COMM CODE:
910-39-055127
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR ONE (1)
TECHNOLOGY COMPLEX
|
1.000
|
TASK
|
N/A
|
$2000.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00011
|
COMM CODE:
910-39-055128
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR TWO (2)
TECHNOLOGY COMPLEX
|
1.000
|
TASK
|
N/A
|
$2000.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00012
|
COMM CODE:
910-39-057259
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR THREE (3)
TECHNOLOGY COMPLEX
|
1.000
|
TASK
|
N/A
|
$2000.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00013
|
COMM CODE:
910-39-057260
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR ONE (1)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
TASK
|
N/A
|
$900.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00014
|
COMM CODE:
910-39-057261
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR TWO (2)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
TASK
|
N/A
|
$900.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00015
|
COMM CODE:
910-39-057262
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR THREE (3)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
TASK
|
N/A
|
$900.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00016
|
COMM CODE:
910-39-057263
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR ONE (1)
FIRING RANGE
|
1.000
|
TASK
|
N/A
|
$200.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00017
|
COMM CODE:
910-39-057264
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR TWO (2)
FIRING RANGE
|
1.000
|
TASK
|
N/A
|
$200.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00018
|
COMM CODE:
910-39-057265
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR THREE (3)
FIRING RANGE
|
1.000
|
TASK
|
N/A
|
$200.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00019
|
COMM CODE:
910-39-057266
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR ONE (1)
TECHNOLOGY COMPLEX
|
1.000
|
TASK
|
N/A
|
$1500.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00020
|
COMM CODE:
910-39-057267
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR TWO (2)
TECHNOLOGY COMPLEX
|
1.000
|
TASK
|
N/A
|
$1500.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00021
|
COMM CODE:
910-39-057268
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR THREE (3)
TECHNOLOGY COMPLEX
|
1.000
|
TASK
|
N/A
|
$1500.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00022
|
COMM CODE:
910-39-057269
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR ONE (1)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
TASK
|
N/A
|
$500.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00023
|
COMM CODE:
910-39-057270
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR TWO (2)
TROOP "C" HEADQUARTERS, SUBSTATION
911 COMMUNICATION CENTER
|
1.000
|
TASK
|
N/A
|
$500.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00024
|
COMM CODE:
910-39-057271
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR THREE (3)
TROOP "C" HEADQUARTERS, SUBSTATION
AND 911 COMMUNICATION CENTER
|
1.000
|
TASK
|
N/A
|
$500.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00025
|
COMM CODE:
910-39-057272
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR ONE (1)
FIRING RANGE
|
1.000
|
TASK
|
N/A
|
$100.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00026
|
COMM CODE:
910-39-057273
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR TWO (2)
FIRING RANGE
|
1.000
|
TASK
|
N/A
|
$100.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00027
|
COMM CODE:
910-39-057274
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE
FOR ONE SEMI-ANNUAL CLEANING
AS PER SPECIFICATIONS.
YEAR THREE (3)
FIRING RANGE
|
1.000
|
TASK
|
N/A
|
$100.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00028
|
COMM CODE:
910-39-057275
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARLY SCHEDULED DAILY TASKS TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR ONE (1)
|
1.000
|
SQ FT
|
N/A
|
$1.02000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00029
|
COMM CODE:
910-39-057276
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARLY SCHEDULED DAILY TASKS TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR TWO (2)
|
1.000
|
SQ FT
|
N/A
|
$1.02000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00030
|
COMM CODE:
910-39-057277
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
REGULARLY SCHEDULED DAILY TASKS TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR THREE (3)
|
1.000
|
SQ FT
|
N/A
|
$1.02000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00031
|
COMM CODE:
910-39-057278
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR ONE (1)
|
1.000
|
SQ FT
|
N/A
|
$.07000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00032
|
COMM CODE:
910-39-057279
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR TWO (2)
|
1.000
|
SQ FT
|
N/A
|
$.07000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00033
|
COMM CODE:
910-39-057280
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
SEMI-ANNUAL CLEANING CYCLE TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR THREE (3)
|
1.000
|
SQ FT
|
N/A
|
$.07000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00034
|
COMM CODE:
910-39-057281
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR ONE (1)
|
1.000
|
SQ FT
|
N/A
|
$.05000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00035
|
COMM CODE:
910-39-057282
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR TWO (2)
|
1.000
|
SQ FT
|
N/A
|
$.05000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00036
|
COMM CODE:
910-39-057283
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ANNUAL CLEANING CYCLE TO ADD
OR DELETE ONE SQUARE FOOT OF SPACE PER
MONTH AS PER SPECIFICATIONS.
YEAR THREE (3)
|
1.000
|
SQ FT
|
N/A
|
$.05000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00037
|
COMM CODE:
910-39-057284
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMAING
SEMI-ANNUAL CLEANING INCLUDING EQUIPMENT
AND MATERIALS.
YEAR ONE (1)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00038
|
COMM CODE:
910-39-057285
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMAING
SEMI-ANNUAL CLEANING INCLUDING EQUIPMENT
AND MATERIALS.
YEAR TWO (2)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00039
|
COMM CODE:
910-39-057286
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMAING
SEMI-ANNUAL CLEANING INCLUDING EQUIPMENT
AND MATERIALS.
YEAR THREE (3)
|
1.000
|
HOUR
|
18.00%
|
N/A
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00040
|
COMM CODE:
910-39-057287
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMAING
ANNUAL CLEANING INCLUDING EQUIPMENT
AND MATERIALS.
YEAR ONE (1)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00041
|
COMM CODE:
910-39-057288
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMAING
ANNUAL CLEANING INCLUDING EQUIPMENT
AND MATERIALS.
YEAR TWO (2)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00042
|
COMM CODE:
910-39-057289
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMAING
ANNUAL CLEANING INCLUDING EQUIPMENT
AND MATERIALS.
YEAR THREE (3)
|
1.000
|
HOUR
|
N/A
|
$18.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00046
|
COMM CODE:
910-39-057293
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE FOR
NON SUPERVISING PROTER SERVICES
AS PER SPECIFICATIONS.
YEAR ONE (1)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00047
|
COMM CODE:
910-39-057294
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE FOR
NON SUPERVISING PROTER SERVICES
AS PER SPECIFICATIONS.
YEAR TWO (2)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00048
|
COMM CODE:
910-39-057295
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE FOR
NON SUPERVISING PROTER SERVICES
AS PER SPECIFICATIONS.
YEAR THREE (3)
|
1.000
|
HOUR
|
N/A
|
$18.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00049
|
COMM CODE:
910-39-057296
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE FOR
SUPERVISING PROTER SERVICES
AS PER SPECIFICATIONS.
YEAR ONE (1)
|
1.000
|
HOUR
|
N/A
|
$17.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00050
|
COMM CODE:
910-39-057297
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE FOR
SUPERVISING PROTER SERVICES
AS PER SPECIFICATIONS.
YEAR TWO (2)
|
1.000
|
HOUR
|
N/A
|
$17.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00051
|
COMM CODE:
910-39-057298
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE FOR
SUPERVISING PROTER SERVICES
AS PER SPECIFICATIONS.
YEAR THREE (3)
|
1.000
|
HOUR
|
N/A
|
$20.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00052
|
COMM CODE:
910-39-057299
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE, SUPERVISOR
FOR EMERGENCY SERVICES.
YEAR ONE (1)
|
1.000
|
HOUR
|
N/A
|
$17.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00053
|
COMM CODE:
910-39-057300
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE, SUPERVISOR
FOR EMERGENCY SERVICES.
YEAR TWO (2)
|
1.000
|
HOUR
|
N/A
|
$17.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00054
|
COMM CODE:
910-39-057301
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE, SUPERVISOR
FOR EMERGENCY SERVICES.
YEAR THREE (3)
|
1.000
|
HOUR
|
N/A
|
$20.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00055
|
COMM CODE:
910-39-057302
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE, LABORER
FOR EMERGENCY SERVICES.
YEAR ONE (1)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00056
|
COMM CODE:
910-39-057341
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE, LABORER
FOR EMERGENCY SERVICES.
YEAR TWO (2)
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00057
|
COMM CODE:
910-39-057342
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
ALL INCLUSIVE HOURLY RATE, LABORER
FOR EMERGENCY SERVICES.
YEAR THREE (3)
|
1.000
|
HOUR
|
N/A
|
$18.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00058
|
COMM CODE:
910-25-067962
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMING
BUFFING, INCLUDES EQUIPMENT AND
MATERIAL AS PER SPECIFICATIONS.
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00059
|
COMM CODE:
910-25-067962
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMING
BUFFING, INCLUDES EQUIPMENT AND
MATERIAL AS PER SPECIFICATIONS.
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00060
|
COMM CODE:
910-25-067962
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
LOADED HOURLY RATE FOR PERFORMING
BUFFING, INCLUDES EQUIPMENT AND
MATERIAL AS PER SPECIFICATIONS.
|
1.000
|
HOUR
|
N/A
|
$15.00000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00061
|
COMM CODE:
910-39-081231
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
DELIVERY: 7 DAYS ARO
|
1.000
|
HOUR
|
N/A
|
$11.95000
|
| LINE# |
DESCRIPTION/MFGR/BRAND |
EST QUANTITY |
UNIT |
% DISCOUNT |
UNIT PRICE |
|
00062
|
COMM CODE:
910-39-085293
[BUILDING MAINTENANCE, INSTALLATION AND...]
ITEM DESCRIPTION:
THIS PRICE LINE IS TO USED BY STATE
AGENCIES IN ACCORDANCE WITH CONTRACT
SECTION 5.24 "ADDITIONAL WORK AND/OR
SPECIAL PROJECTS".
DELIVERY: 7 DAYS ARO
|
1.000
|
TASK
|
NET
|
N/A
|