Doing Business: NJTA Standard Drawings

Standard Drawings

Bridge Fencing (BF)

Bridge Miscellaneous (BR)

Overhead Span HCMS Support Structures (CM)

Concrete Curb (CU)

Delineator (DE)

Drainage and Erosion Control (DR)

Lighting and Luminaire (E)

Fencing (FE)

Foundation Excavation (FX)

Guard Rail (GR)

Intelligent Transportation System (ITS)

Median Barrier (MB)

Median Fencing (MF)

Pavement Marking (PM)

Resurfacing (RE)

Signage (SI)

SIGN LEGEND (SL)

Toll Booth (TB)

Toll Island (TI)

Traffic Protection (TP)

Tree Protection (TW)

Overhead Span VMS/VSLS Support Structures (VM)

Engineering Department Index of Standard Drawings

» Back to Top

Revisions to Index of Standard Drawings

2010

Description Date Revised / New Standard Drawings Document Change Memo
Revisions to Standard Drawings SI-13, SI-17, S-18B, VM-1, VM-8, VM-13, VM-14, VM-16, VM-17, SI-18-C, SI-19, SI-22. SI-22A, SI-22B, VM-11, VM-13, VM-9. February 2, 2010 SI-13, SI-17, S-18B, VM-1, VM-8, VM-13, VM-14, VM-16, VM-17, SI-18-C, SI-19, SI-22. SI-22A, SI-22B, VM-11, VM-13, VM-9
Standard Drawings for DATIM Enclosures, Sheets TB-8 through TB-11 have been developed. March 3, 2010 Index-1, TB-8, TB-9, TB-10 and TB-11
New Standard Drawings CM-1 through CM-10 has been developed. April 6, 2010 CM -1, CM-2, CM-3, CM-4, CM-5, CM-6, CM-7, CM-8, CM-9 and CM-10
Revisions to Standard Drawings VM-1, VM-2, VM-4 through VM-8, VM-10, VM-17, VM-18 and VM-20 through VM-22 June 30, 2010 VM-1, VM-2, VM-4 through VM-8, VM-10, VM-17, VM-18, VM-20 through VM-22
Standard Drawing BR-13 has been revised to improve detailing based on current practices by the joint manufacturers and to reflect recent NJTA Design Manual changes. July 28, 2010 BR-13
New Standard Drawings VM-17 through VM-22 for VM overhead sign structure with spans greater than 85 feet. September 2, 2010 VM-17 through VM-22
Standard Drawings BR-15, E-14, E-21, E-22 and E-24 have been revised to accommodate changes in lighting design and equipment requirements. September 15, 2010 BR-15, E-14, E-21, E-22 and E-24
The new Standard Drawings ITS-1 through ITS-34 are new drawings which have been developed in support of Intelligent Transportation System (ITS) device and infrastructure installations. September 15, 2010 ITS-1 through ITS-34
Standard Drawing GR-5 is required to update general notes.
Standard Drawings P 1 to 6 have been revised to comply with MUTCD 2009 and current design standards.
September 22, 2010 GR-5 and PM 1 – 6
Standard Drawings BR-5, BR-13 & FX-1 will update the method of sealing joint between concrete slope protection and abutment face to utilize modern and readily available plastic waterstops in lieu of flashing; waterstops for working joints are available. The new configuration will facilitate construction by removing labor intensive tasks of constructing reglet, flashing and caulking. September 28, 2010 BR-5, BR-13 & FX-1
Standard Drawings SI-28 to SI-42 have been developed to standardize the design and construction of overhead span and cantilever type sign structures to be utilized on the Garden State Parkway. October 21, 2010 SI-28 to SI-42

2011

Description Date Revised / New Standard Drawings Document Change Memo
Standard Drawings FE-1 and FE-2 have been revised to provide currently available fence options.  ITS-10 has been revised to provide consistency in drafting conduit line style. January 3, 2011 FE-1, FE-2 & ITS-10
Standard Drawings BR-16 has been created to provide necessary details for box girder pier cap drainage and hatch covers. Providing these details will ensure consistency in design of new structures as well as for revisions to existing structures. March 4, 2011 BR-16
Standard Drawings SI-35 has been revised to more clearly define the provisional sign area and to identify the edge of pavement in the elevation view. April 6, 2011 SI-35
Standard Drawing GR-9 has been modified to simplify Berm Surfacing detail.  E-14 has been modified to revise Median/Parapet detail.  ITS-1 to 15 and ITS-17 to 34, VM-1 to 22, and CM-1 to 10 has been revised. May 16, 2011 GR-9, E-14, ITS-1 to 15, ITS-17 to 34, VM-1 to 22, CM-1 to 10
Standard Drawing VM-8 has been revised to include CSL tubes in the drill shaft foundation to be consistent with the Standard Supplemental Specifications.
Standard Drawing VM-11 has been revised to correct dimensional criteria for the edge of the sign chord and the lane line at the request of NJTA Operations Department.
September 19, 2011 VM-8 and VM-11
Standard Drawing E-02 through E-05 have been revised to reflect recent updates to design standard minimums for bridge mounted lighting to mitigate fatigue issues in welded aluminum light standards. November 7, 2011 E-02 through E-05

» Back to Top

2012

Description Date Revised / New Standard Drawings Document Change Memo
Standard Drawings ITS-1, 2, 7, 8, 9, 10, 11, 12, 14, 16, 20, 22, 24, & 26, SI-22B, VM-8 & VM-9 have been revised to include modifications required to clarify grounding details. March 2012 ITS-1, 2, 7, 8, 9, 10, 11, 12, 14, 16, 20, 22, 24, & 26, SI-22B, VM-8 & VM-9
Standard Drawing BR-10 has been revised to reflect criteria in the latest AASHTO LRFD Bridge Design Specifications and preferred detailing to allow for ease of future bearing replacement. April 17, 2012 BR-10
Standard Drawing BR-12 has been revised to reflect criteria in the latest AASHTO LRFD Bridge Design Specifications and to provide additional options for HLMR bearings. April 17, 2012 BR-12
Standard Drawings E-02 through E-05 have been revised to include an "Instruction to Designers" note to each sheet to reflect the Authority's intent for fatigue design of bridge mounted lighting standards. April 24, 2012 E-02 through E-05
Standard Drawings E-01, E-03 and E-03A have been revised. E-03A has been created to provide details for both Type H and Type V pole-top luminaire mounting assembly details. E-03 has been revised; all mounting details were moved to E-03A. E-01 has been revised to agree with E-03 and E-03A. . June 5, 2012 E-01, E-03 and E-03A
A new Standard Drawing BR-9 has developed. BR-9 will provide guidance to Design Engineers for the design and detailing requirements for Seismic Isolation Bearings similar to how BR-10 and BR-12 do for Elastomeric and HLMR Bearings respectively. July 11, 2012 BR-9
Utility companies now require a Meter Disconnect before the meter (cold sequence) for 480 volt services. Drawings E-32, E-33, E-34 and E-35 have been updated to accommodate the disconnect switch and other minor changes. August 28, 2012 E-32, E-33, E-34, E-35
Revised the contrast striping details for both paint and tape applications. A table of Standard Striping Materials and Procedures was removed from the specifications and relocated to the New Standard Drawing PM-5. September 12, 2012 PM-5

» Back to Top

2013

Description Date Revised / New Standard Drawings Document Change Memo
Replace Drawings DE-1 and DE-2 with new and revised Drawings DE-1 to DE-6.
Replace Drawings E-21, E-22 and E-29 with revised and reissued Drawings E-21, E-22 and E-29.
Replace Drawings GR-5, GR-14 and GR-15 with revised Drawings GR-5, GR-14 and GR-15.
Replace Drawings PM-1 to PM-4 with revised and reissued Drawings PM-1 to PM-4.
Remove Drawings SI-1 to SI-12 and add new Drawings SL-1 to SL-27.
Replace Drawings SI-22B and SI-28 to SI-42 with revised Drawings SI-22B and SI-28 to SI-42.
Replace Index of Standard Drawings, sheets 1 and 2.
January 17, 2013 DE-1 - DE-6, E-21- E-22, E-29, GR-5, GR-14 - GR-15, PM-1 - PM-4, SL-1 - SL-27, SI-22B, SI-28 - SI-42
Replace Drawings GR-7, GR-11, ITS-17 and ITS-18 with revised Drawings GR-7, GR-11, ITS-17 and ITS-18, Replace Index of Standard Drawings, sheets 1 and 2. March 11, 2013 GR-7, GR-11, ITS-17 and ITS-18

» Back to Top

2014

Description Date Revised / New Standard Drawings Document Change Memo
Standard Drawings ITS-01 to ITS-36 have been updated to confirm set with a cleaner appearance by removing all previous notations and a large number of previous revision and added a spare 50 micron 6-fiber optic cable from SCC to VMS for future use. Issuance of New Standard Drawings ITS-37 to ITS-48 for Hybrid Changeable Message Sign (HCMS). January 16, 2014 ITS-01 through ITS-36, ITS-37 through ITS-48
Added the optional poured-in-place monument detail to Standard Drawing sheet DE-1. Modified the existing precast monument detail to be set flush with the finished grade. January 23, 2014 DE-1