FY 2003 - 2005 Statewide
Transportation Improvement Program

2001 Major Project Status

Federal regulations require that the STIP list major projects from the previous STIP that were implemented and identify any significant delays in the planned implementation of major projects. The following is a list of major projects from the FY 2002-04 STIP.

DB No.

County

Project

Status

X204

Atlantic

Rt. 9 (32) Martin Terrace Road to North Shore Road

Left-turn slots and road resurfacing were constructed with state funds.  The Pitney Road intersection improvement will be done under a separate contract.

244

Atlantic
Cape May

Rt. 52, Causeway Replacement and Somers Point Circle Elimination

Final scope development was authorized

063

Bergen

Rt. 4, Sec. 2AC, Fairview Avenue to Johnson Avenue

Construction scheduled for FY 2003

9105

Bergen

Rt. 17 (3) Essex Street over Route 17, bridge replacement

Construction scheduled for FY 2003

93173

Bergen

Rt. 17, Essex Street Drainage

Construction scheduled for FY 2003

93281

Bergen

Rt. 46, Main Street, Lodi

Initial design is underway; construction scheduled for FY 2005

284J

Bergen

Rt. 80/95, Sec. E&J, Palisades Avenue to I-95

Design authorized; right of way scheduled for FY 2004; construction scheduled for FY 2005

284G

Bergen

Rt. 80, Sec. G, Garden State Parkway to vicinity of Rt. 17

Under construction

284I

Bergen

Rt. 80, Sec. I, Local lanes from Rt. 17 to vicinity of Kennedy Avenue off ramp

Under construction

858

Bergen

Rt. 287, Truck Weigh Station, Bergen County

Design scheduled in FY 2003; right of way scheduled in FY 2004; construction scheduled in FY 2005

077

Burlington

Rt.9 Bridge over Bass River, Replacement

Construction contract awarded 6/24/02.  Scheduled for completion in 12/04.

191A

Burlington

I-295 / Rt 38 Missing Moves

Project in FA with FSD in FY03

567

Burlington

Rt. 73 / Rt. 70, Marlton Circle Elimination

FSD started 5/23/02.  New schedule being developed.

9208

Burlington

Rt. 206, Old York Rd. and Rising Sun Rd. Operational Imp.

Design underway.  ROW appraisals should start shortly.

95078B

Burlington

Rt. 130 Corridor No. 3B

Corridor concept development continuing.  One breakout project (Route 130, Campus Drive) is underway as a Burlington County lead.

99373

Burl./Cam.

I-295 Rigid Pavement Rehabilitation

Advertising date 9/12/02 with con award on 10/30/02, CON in FY03-04.

155B

Camden

Rt. 30 / Rt. 130 Collingswood Circle Elimination

FSD underway, project on accelerated schedule and will be advanced to con in FY04. Currently CON FY05-06.

157

Camden

Rt. 30 Bridges over Atlantic City Line, Replacement

Project under construction, estimated completion date 12/01/03.

355

Camden

I-295 / 42 / I-76 Study B - Direct Connection

Public information center was held on 4/24/02 with positive reaction. Technical environmental studies will begin in Autumn 2002 and completed during FY03, FA in FY03-04

355A

Camden

I-295 / 42 Study A - Missing Moves

Project in FSD.

DES FY03, ROW FY04 and CON FY05.

470

Camden

Maple Ave Bridge, Haddonfield

Project was awarded for CON on 4/26/02. Pre – con meeting was held on 6/19/02.

93109

Camden

Rt. 30 / Rt. 73 Berlin Improvements

Project in final design

ROW in FY03 with CON in FY05-06.

98553

Camden

Delaware River Tram

CON in FY03  by DRPA

229

Cape May

Rt. 47, Section 1C, Garden State Parkway to Railroad Avenue

Construction authorized

9013A

Cumberland

Rt. 47, Operational Improvements, Sharp Street to Sherman Avenue

Engineering authorized

9043

Essex

Doremus Avenue Road, Wilson Avenue to Raymond Boulevard

Construction contract awarded June 2002

94047

Essex

Rt. 1&9, Haynes Avenue over Waverly Yards and Amtrak

Design authorized; right of way scheduled in FY 2004; construction scheduled in FY 2005

121

Essex

Rt. 21/22/1&9, Sec. 2N 15K 2AN, Bridge over I-78 and Amtrak

Under construction

722

Essex

Rt. 21, TSM 6, Contract 1, Raymond Boulevard to I-280 overpass

Under construction

722B

Essex

Rt. 21, TSM 6, Contract 3, I-280 overpass to Passaic Street

Project is on schedule

201

Gloucester

Rt. 41 / 42 Freeway Operational Improvements

Project in final design, has Green Acres issues, proceeding with selection new Designer, Award date 3/5/03.

CON FY03-04.

232C

Gloucester

Rt. 47 Intersection Improvements (Sites 1 & 6)

Project in final design with submittal in 3/03. CON in FY03-04.

232D1

Gloucester

Rt. 47, Rt. 322 High Street to Greentree Road (Sites 2 & 7)

Project in final design with submittal in early FY03.

CON in FY04.

9332

Gloucester

Rt. 55 Fwy / Deptford Center Road

Concept Develop will be continued in FY 2003

903

Hudson

Weehawken Ferry/Multi-Modal Facility

NJ TRANSIT anticipates getting permits and approvals by March 2003, after which dredging will begin and last through September 2003.  Construction will follow and take approximately a year, with a projected completion date of September 2004.

9267B

Hudson

Rt. 1&9/3, (24) Amtrak Bridge

Project authorized for construction

X207

Hudson

Bergen

Rt. 1&9 (28) Secaucus Road to Broad Avenue

Project is on schedule

051

Hudson

Rt. 1&9 T (25) St. Paul’s Avenue Bridge

Project is on schedule

053B

Hudson

Rt. 139, Contract 2, 12th Street Viaduct, 14th Street Viaduct

Project is on schedule

053C

Hudson

Rt. 139, Contract 3, Hoboken Viaduct and Conrail Viaduct

Project is on schedule

167B

Hunterdon

Rt. 31, Sec. 6E 6F, River Road to Stanton Station Road

Under construction

403A

Hunterdon

Rt. 31, Flemington Area Congestion Mitigation

Project is on schedule

403B

Hunterdon

Rt. 31/202, Flemington Circle

Project is on schedule

00334

Mercer

I-195 Mercer County Resurfacing (eastbound)

Under construction

031

Mercer

Rt. 1/CR 571 Corridor Traffic Improvement Project

The Environmental Impact Statement process is continuing to determine a solution to address congestion in this area of Route 1.

551A

Mercer

Rt. 29 Boulevard Landscaping

Project awarded for construction that will begin in 8/02 and will last approximately 18 month.

551B

Mercer

Rt. 29 Delaware River Pedestrian/Bike Path

Project sent back to FSD. Project limits being extended. Discussion continues with the City of Trenton and the DRJTC regarding security issues with the proposed project limits.

9194

Mercer

I-95 / Scotch Rd. Interchange Improvement

Project under construction.

94010

Mercer

I-295 Noise Barriers, Hamilton Twp.

Project in Design with CON in FY03-04.

97110

Mercer

Rt. 1 / Meadow Rd. Grade Separated Interchange

The grade-separated interchange is open to traffic.

D9906

Mercer

Washington Crossing - Pennington Road Bridge over Conrail

Construction is anticipated in FY 2004; this is a Mercer County lead.

L067

Mercer

Southard St. Bridge, Replacement

Design underway with completion date in 9/03, award in 4/04, and CON in FY04.

035

Middlesex

Rt. 1/130/171, Sec. 6T 16E 1B, Route 1/130 Interchange

Under construction

047

Middlesex

Rt. 1, Sec. 7L, Pierson Avenue to Garden State Parkway

Project is on schedule

047B

Middlesex

Rt. 1, Conrail

Project is on schedule

048

Middlesex

Union

Rt. 1&9, Sec. 1K 3M, Production Way to East Lincoln Avenue

Project is on schedule

078C

Middlesex

Rt. 9, Sec. 1M, Edison Bridge, rehabilitation

Under construction

078B

Middlesex

Rt. 9/35, Sec. 25C 25L, Victory Circle Elimination

Project is on schedule

115A

Middlesex

Rt. 18 Ext., Sec. 2A, River Road to Hoes Lane

Under construction

108

Middlesex

Rt. 18, Sec. 2F 7E 11H, Route 1 to south of Rt. 27

Project is on schedule

93227D

Middlesex

Rt. 27, Sec. 6M, Amtrak structure over Evergreen Road

Project authorized for construction

93227B

Middlesex

Rt. 27, Oak Tree Road

Construction scheduled for FY 2005

177A

Middlesex

Monmouth

Rt. 35, Sec. 4, Matawan Creek to Laurence Harbor Parkway

Project is on schedule

178

Middlesex

Rt. 35, Sec. 12T, Victory Bridge

Project is on schedule

9155

Middlesex

Rt. 130 (16), Renaissance Boulevard to Adams Lane

Construction is scheduled for FY 2004

174J

Monmouth

Rt. 9/79, Schanck Road/Rt. 79/Willowbrook Road

Project is on schedule

170

Monmouth

Rt. 33, Sec. 9A, Rt. 35 to Rt. 71 (Corlies Avenue)

Construction is scheduled for FY 2003

428A

Monmouth
Ocean

Rt. 70 (4), Manasquan River Bridge

Project is on schedule

897

Morris

Rt. 287/10, Morris County, north of Rt. 10 to vicinity of Parsippany Road

Project is on schedule

00356

Morris
Passaic
Bergen

Rt. 287, Pavement Rehabilitation, Morris, Passaic, Bergen

Under construction

9147C

Ocean

Rt. 35, Restoration, Dover Twp. To Mantoloking (MP 4-9)

Construction is scheduled for FY 2005

9116

Passaic

Rt. 46/80/23 (43) interchange improvements

Construction is scheduled for FY 2004

9118

Passaic

Rt. 46/CR 635 (46), Browertown Road

Construction is scheduled for FY 2004

9029

Passaic

Rt. 46/CR 614/623 (47), Van Houten Avenue/Grove Street

Project is on schedule

9117

Passaic

Rt. 46/CR 646, Sec. 12K 13E, Union Boulevard

Construction delayed until FY 2005 due to southeast quadrant not being finalized with access due to impacts and proposed redesign of ramps

240A

Salem

Rt. 49, Sec. 2A, Salem River Bridge

Construction authorized

240

Salem

Rt. 49, Sec. 3J 4C, Alloway Creek Bridge

Construction authorized

779

Somerset

Rt. 206 Bypass, Sec. 14A 15A

Project is on schedule

780

Somerset

Rt. 206, Sec. 15N, Old Somerville Road to Brown Avenue

Project is on schedule

L080

Sussex

Rt. 15, Sec. 4C, Houses Corner Road

Under construction

98545

Union

Garden State Parkway, Interchange 142

Project is on schedule

043

Union

Rt. 1&9, Sec. 4T, Elizabeth River Bridge

Project is on schedule

048A

Union

Rt. 1&9, Rahway River Bridge

Project is on schedule

9141

Union

Rt. 78/CR 655, Diamond Hill Road

Construction has been delayed until FY 2005 due to the need to re-baseline the schedule to incorporate recommendations from the Twp. Of Berkley Heights and FHWA.

860

Warren

Rt. 78, Sec. 6J 6K, Truck weigh stations

Project is on schedule

T37

NJ TRANSIT

Rail Support Facilities and Equipment

Included within this program is the construction of the Morrisville Yard which is anticipated to be completed by mid-2003.

T53G

NJ TRANSIT

Rail Fleet Overhaul

160 Comet II/IIB Overhauls are continuing; last car delivery is anticipated in 2004.

T55

NJ TRANSIT

Other Rail Station/Terminal Improvements

Included within this program is the renovation of the Trenton Station; design is 30% completed for this location.

T107

NJ TRANSIT

Southern New Jersey LRT

Construction is continuing; this rail line is anticipated to be open in mid-2003.

njdot watermark legal statement privacy notice contact njdot njhome NJ Home
  department about dot | motor vehicles | commuter info | in the works | doing business | capital improvements | community programs | data | links
  statewide: njhome| my new jersey | people | business | government | departments 
 
  Copyright © State of New Jersey, 2002-2005
  Department of Transportation
  P.O. Box 600
  Trenton, NJ 08625-0600

  Last Updated: November 6, 2002
njhome my new jersey people business government departments njdot home njdot home njdot home njdot search