DB No.
|
County
|
Project
|
Status
|
X204
|
Atlantic
|
Rt. 9 (32) Martin Terrace Road to North Shore Road
|
Left-turn
slots and road resurfacing were constructed with
state funds. The Pitney Road intersection improvement
will be done under a separate contract.
|
244
|
Atlantic
Cape
May
|
Rt. 52, Causeway Replacement and Somers Point Circle Elimination
|
Final scope development was authorized
|
063
|
Bergen
|
Rt. 4, Sec. 2AC, Fairview Avenue to Johnson Avenue
|
Construction scheduled for FY 2003
|
9105
|
Bergen
|
Rt. 17 (3) Essex Street over Route 17, bridge replacement
|
Construction scheduled for FY 2003
|
93173
|
Bergen
|
Rt. 17, Essex Street Drainage
|
Construction scheduled for FY 2003
|
93281
|
Bergen
|
Rt. 46, Main Street, Lodi
|
Initial design is underway; construction scheduled for
FY 2005
|
284J
|
Bergen
|
Rt. 80/95, Sec. E&J, Palisades Avenue to I-95
|
Design authorized; right of way scheduled for FY 2004;
construction scheduled for FY 2005
|
284G
|
Bergen
|
Rt. 80, Sec. G, Garden State Parkway to vicinity of Rt.
17
|
Under construction
|
284I
|
Bergen
|
Rt. 80, Sec. I, Local lanes from Rt. 17 to vicinity of
Kennedy Avenue off ramp
|
Under construction
|
858
|
Bergen
|
Rt. 287, Truck Weigh Station, Bergen County
|
Design scheduled in FY 2003; right of way scheduled in
FY 2004; construction scheduled in FY 2005
|
077
|
Burlington
|
Rt.9 Bridge over Bass River, Replacement
|
Construction
contract awarded 6/24/02. Scheduled for completion
in 12/04.
|
191A
|
Burlington
|
I-295 / Rt 38 Missing Moves
|
Project in FA with FSD in FY03
|
567
|
Burlington
|
Rt. 73 / Rt. 70, Marlton Circle Elimination
|
FSD
started 5/23/02. New schedule being developed.
|
9208
|
Burlington
|
Rt. 206, Old York Rd. and Rising Sun Rd. Operational Imp.
|
Design
underway. ROW appraisals should start shortly.
|
95078B
|
Burlington
|
Rt. 130 Corridor No. 3B
|
Corridor
concept development continuing. One breakout
project (Route 130, Campus Drive) is underway
as a Burlington County lead.
|
99373
|
Burl./Cam.
|
I-295 Rigid Pavement Rehabilitation
|
Advertising date 9/12/02 with con award on 10/30/02, CON
in FY03-04.
|
155B
|
Camden
|
Rt. 30 / Rt. 130 Collingswood Circle Elimination
|
FSD underway, project on accelerated schedule and will
be advanced to con in FY04. Currently CON FY05-06.
|
157
|
Camden
|
Rt. 30 Bridges over Atlantic City Line, Replacement
|
Project under construction, estimated completion date 12/01/03.
|
355
|
Camden
|
I-295 / 42 / I-76 Study B - Direct Connection
|
Public information center was held on 4/24/02 with positive
reaction. Technical environmental studies will
begin in Autumn 2002 and completed during FY03,
FA in FY03-04
|
355A
|
Camden
|
I-295 / 42 Study A - Missing Moves
|
Project in FSD.
DES FY03, ROW FY04 and CON FY05.
|
470
|
Camden
|
Maple Ave Bridge, Haddonfield
|
Project was awarded for CON on 4/26/02. Pre – con meeting
was held on 6/19/02.
|
93109
|
Camden
|
Rt. 30 / Rt. 73 Berlin Improvements
|
Project in final design
ROW in FY03 with CON in FY05-06.
|
98553
|
Camden
|
Delaware River Tram
|
CON
in FY03 by DRPA
|
229
|
Cape
May
|
Rt. 47, Section 1C, Garden State Parkway to Railroad Avenue
|
Construction authorized
|
9013A
|
Cumberland
|
Rt. 47, Operational Improvements, Sharp Street to Sherman
Avenue
|
Engineering authorized
|
9043
|
Essex
|
Doremus Avenue Road, Wilson Avenue to Raymond Boulevard
|
Construction contract awarded June 2002
|
94047
|
Essex
|
Rt. 1&9, Haynes Avenue over Waverly Yards and Amtrak
|
Design authorized; right of way scheduled in FY 2004; construction
scheduled in FY 2005
|
121
|
Essex
|
Rt. 21/22/1&9, Sec. 2N 15K 2AN, Bridge over I-78 and
Amtrak
|
Under construction
|
722
|
Essex
|
Rt. 21, TSM 6, Contract 1, Raymond Boulevard to I-280 overpass
|
Under construction
|
722B
|
Essex
|
Rt. 21, TSM 6, Contract 3, I-280 overpass to Passaic Street
|
Project is on schedule
|
201
|
Gloucester
|
Rt. 41 / 42 Freeway Operational Improvements
|
Project in final design, has Green Acres issues, proceeding
with selection new Designer, Award date 3/5/03.
CON FY03-04.
|
232C
|
Gloucester
|
Rt. 47 Intersection Improvements (Sites 1 & 6)
|
Project in final design with submittal in 3/03. CON in
FY03-04.
|
232D1
|
Gloucester
|
Rt. 47, Rt. 322 High Street to Greentree Road (Sites 2
& 7)
|
Project in final design with submittal in early FY03.
CON in FY04.
|
9332
|
Gloucester
|
Rt. 55 Fwy / Deptford Center Road
|
Concept Develop will be continued in FY 2003
|
903
|
Hudson
|
Weehawken Ferry/Multi-Modal Facility
|
NJ
TRANSIT anticipates getting permits and approvals
by March 2003, after which dredging will begin
and last through September 2003. Construction
will follow and take approximately a year, with
a projected completion date of September 2004.
|
9267B
|
Hudson
|
Rt. 1&9/3, (24) Amtrak Bridge
|
Project authorized for construction
|
X207
|
Hudson
Bergen
|
Rt. 1&9 (28) Secaucus Road to Broad Avenue
|
Project is on schedule
|
051
|
Hudson
|
Rt. 1&9 T (25) St. Paul’s Avenue Bridge
|
Project is on schedule
|
053B
|
Hudson
|
Rt. 139, Contract 2, 12th Street Viaduct, 14th
Street Viaduct
|
Project is on schedule
|
053C
|
Hudson
|
Rt. 139, Contract 3, Hoboken Viaduct and Conrail Viaduct
|
Project is on schedule
|
167B
|
Hunterdon
|
Rt. 31, Sec. 6E 6F, River Road to Stanton Station Road
|
Under construction
|
403A
|
Hunterdon
|
Rt. 31, Flemington Area Congestion Mitigation
|
Project is on schedule
|
403B
|
Hunterdon
|
Rt. 31/202, Flemington Circle
|
Project is on schedule
|
00334
|
Mercer
|
I-195 Mercer County Resurfacing (eastbound)
|
Under construction
|
031
|
Mercer
|
Rt. 1/CR 571 Corridor Traffic Improvement Project
|
The Environmental Impact Statement process is continuing
to determine a solution to address congestion
in this area of Route 1.
|
551A
|
Mercer
|
Rt. 29 Boulevard Landscaping
|
Project awarded for construction that will begin in 8/02
and will last approximately 18 month.
|
551B
|
Mercer
|
Rt. 29 Delaware River Pedestrian/Bike Path
|
Project sent back to FSD. Project limits being extended.
Discussion continues with the City of Trenton
and the DRJTC regarding security issues with the
proposed project limits.
|
9194
|
Mercer
|
I-95 / Scotch Rd. Interchange Improvement
|
Project under construction.
|
94010
|
Mercer
|
I-295 Noise Barriers, Hamilton Twp.
|
Project in Design with CON in FY03-04.
|
97110
|
Mercer
|
Rt. 1 / Meadow Rd. Grade Separated Interchange
|
The grade-separated interchange is open to traffic.
|
D9906
|
Mercer
|
Washington Crossing - Pennington Road Bridge over Conrail
|
Construction is anticipated in FY 2004; this is a Mercer
County lead.
|
L067
|
Mercer
|
Southard St. Bridge, Replacement
|
Design underway with completion date in 9/03, award in
4/04, and CON in FY04.
|
035
|
Middlesex
|
Rt. 1/130/171, Sec. 6T 16E 1B, Route 1/130 Interchange
|
Under construction
|
047
|
Middlesex
|
Rt. 1, Sec. 7L, Pierson Avenue to Garden State Parkway
|
Project is on schedule
|
047B
|
Middlesex
|
Rt. 1, Conrail
|
Project is on schedule
|
048
|
Middlesex
Union
|
Rt. 1&9, Sec. 1K 3M, Production Way to East Lincoln
Avenue
|
Project is on schedule
|
078C
|
Middlesex
|
Rt. 9, Sec. 1M, Edison Bridge, rehabilitation
|
Under construction
|
078B
|
Middlesex
|
Rt. 9/35, Sec. 25C 25L, Victory Circle Elimination
|
Project is on schedule
|
115A
|
Middlesex
|
Rt. 18 Ext., Sec. 2A, River Road to Hoes Lane
|
Under construction
|
108
|
Middlesex
|
Rt. 18, Sec. 2F 7E 11H, Route 1 to south of Rt. 27
|
Project is on schedule
|
93227D
|
Middlesex
|
Rt. 27, Sec. 6M, Amtrak structure over Evergreen Road
|
Project authorized for construction
|
93227B
|
Middlesex
|
Rt. 27, Oak Tree Road
|
Construction scheduled for FY 2005
|
177A
|
Middlesex
Monmouth
|
Rt. 35, Sec. 4, Matawan Creek to Laurence Harbor Parkway
|
Project is on schedule
|
178
|
Middlesex
|
Rt. 35, Sec. 12T, Victory Bridge
|
Project is on schedule
|
9155
|
Middlesex
|
Rt. 130 (16), Renaissance Boulevard to Adams Lane
|
Construction is scheduled for FY 2004
|
174J
|
Monmouth
|
Rt. 9/79, Schanck Road/Rt. 79/Willowbrook Road
|
Project is on schedule
|
170
|
Monmouth
|
Rt. 33, Sec. 9A, Rt. 35 to Rt. 71 (Corlies Avenue)
|
Construction is scheduled for FY 2003
|
428A
|
Monmouth
Ocean
|
Rt. 70 (4), Manasquan River Bridge
|
Project is on schedule
|
897
|
Morris
|
Rt. 287/10, Morris County, north of Rt. 10 to vicinity
of Parsippany Road
|
Project is on schedule
|
00356
|
Morris
Passaic
Bergen
|
Rt. 287, Pavement Rehabilitation, Morris, Passaic, Bergen
|
Under construction
|
9147C
|
Ocean
|
Rt. 35, Restoration, Dover Twp. To Mantoloking (MP 4-9)
|
Construction is scheduled for FY 2005
|
9116
|
Passaic
|
Rt. 46/80/23 (43) interchange improvements
|
Construction is scheduled for FY 2004
|
9118
|
Passaic
|
Rt. 46/CR 635 (46), Browertown Road
|
Construction is scheduled for FY 2004
|
9029
|
Passaic
|
Rt. 46/CR 614/623 (47), Van Houten Avenue/Grove Street
|
Project is on schedule
|
9117
|
Passaic
|
Rt. 46/CR 646, Sec. 12K 13E, Union Boulevard
|
Construction delayed until FY 2005 due to southeast quadrant
not being finalized with access due to impacts
and proposed redesign of ramps
|
240A
|
Salem
|
Rt. 49, Sec. 2A, Salem River Bridge
|
Construction authorized
|
240
|
Salem
|
Rt. 49, Sec. 3J 4C, Alloway Creek Bridge
|
Construction authorized
|
779
|
Somerset
|
Rt. 206 Bypass, Sec. 14A 15A
|
Project is on schedule
|
780
|
Somerset
|
Rt. 206, Sec. 15N, Old Somerville Road to Brown Avenue
|
Project is on schedule
|
L080
|
Sussex
|
Rt. 15, Sec. 4C, Houses Corner Road
|
Under construction
|
98545
|
Union
|
Garden State Parkway, Interchange 142
|
Project is on schedule
|
043
|
Union
|
Rt. 1&9, Sec. 4T, Elizabeth River Bridge
|
Project is on schedule
|
048A
|
Union
|
Rt. 1&9, Rahway River Bridge
|
Project is on schedule
|
9141
|
Union
|
Rt. 78/CR 655, Diamond Hill Road
|
Construction has been delayed until FY 2005 due to the
need to re-baseline the schedule to incorporate
recommendations from the Twp. Of Berkley Heights
and FHWA.
|
860
|
Warren
|
Rt. 78, Sec. 6J 6K, Truck weigh stations
|
Project is on schedule
|
T37
|
NJ TRANSIT
|
Rail Support Facilities and Equipment
|
Included within this program is the construction of the
Morrisville Yard which is anticipated to be completed
by mid-2003.
|
T53G
|
NJ TRANSIT
|
Rail Fleet Overhaul
|
160 Comet II/IIB Overhauls are continuing; last car delivery
is anticipated in 2004.
|
T55
|
NJ TRANSIT
|
Other Rail Station/Terminal Improvements
|
Included within this program is the renovation of the Trenton
Station; design is 30% completed for this location.
|
T107
|
NJ TRANSIT
|
Southern New Jersey LRT
|
Construction is continuing; this rail line is anticipated
to be open in mid-2003.
|